My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dock and Marine Construction Corp
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-04-01) Bella Vista Seawall Replacement
>
Responses
>
Dock and Marine Construction Corp - NON-RESPONSIVE
>
Dock and Marine Construction Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 12:08:06 PM
Creation date
10/7/2025 12:07:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />20 <br />ITB 25-04-01 BELLA VISTA SEAWALL REPLACEMENT <br /> <br /> <br /> <br />2.22 UTILITY <br /> <br />It shall be the responsibility of the Contractor to contact all affected utility owners and determine <br />the precise locations of all utilities prior to beginning construction. Utility owners shall be <br />contacted a minimum of 72 hours prior to the commencement of operations. Special care shall <br />be used in working around or near existing utilities, protecting them when necessary to provide <br />uninterrupted service. In the event that any utility service is interrupted, the Contractor shall <br />notify the utility owner immediately and shall cooperate with the owner, or his representative, in <br />the restoration of service in the shortest time possible. Existing fire hydrants shall be kept <br />accessible to fire departments at all times. <br />2.23 FINAL CLEAN-UP <br /> <br />The Contractor shall at all times keep the premises free from accumulation of waste materials or <br />rubbish caused by his employees or the Work. Upon final completion of the Work and before <br />acceptance and final payment shall be made, the Contractor shall clean and remove from the site <br />and adjacent property, all surplus and discarded materials, rubbish, and temporary structures. <br />The Contractor shall restore in an acceptable manner all property which, has been damaged <br />during the execution of the work. The Contractor shall leave the site and vicinity unobstructed in <br />a neat and presentable condition throughout the entire area. <br /> <br />The contractor shall properly dispose, at its own cost, of any waste resulting from the work being <br />performed in an approved facility at an approved site unless otherwise specified in this document. <br />2.24 E-VERIFY <br /> <br />Florida Statute 448.095 directs all public employers, including municipal governments, to verify <br />the employment eligibility of all new public employees through the U.S. Department of Homeland <br />Security’s E-Verify System, and further provides that a public employer may not enter into a <br />contract unless each party to the contract registers with and uses the E-Verify system. Florida <br />Statute 448.095 further provides that if a contractor enters into a contract with a subcontractor, <br />the subcontractor must provide the contractor with an affidavit stating that the subcontractor <br />does not employ, contract with, or subcontract with an unauthorized alien. <br /> <br />In accordance with Florida Statute 448.095, all contractors doing business with the City of Sunny <br />Isles Beach are required to verify employee eligibility using the E-Verify system for all existing and <br />new employees hired by the contractor during the contract term. Further, the contractor must <br />also require and maintain the statutorily required affidavit of its subcontractors. It is the <br />responsibility of the awarded vendor to ensure compliance with E-Verify requirements (as <br />applicable). To enroll in E-Verify, employers should visit the E-Verify website (https://www.e- <br />verify.gov/employers/enrolling-in-e-verify) and follow the instructions. The contractor must, as <br />usual, retain the I-9 Forms for inspection.
The URL can be used to link to this page
Your browser does not support the video tag.