My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dock and Marine Construction Corp
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-04-01) Bella Vista Seawall Replacement
>
Responses
>
Dock and Marine Construction Corp - NON-RESPONSIVE
>
Dock and Marine Construction Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 12:08:06 PM
Creation date
10/7/2025 12:07:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br />Q7. Bid items 9, remove 2" electrical conduit and services not shown in the plans. can you provide <br />locations and detail? <br />A7. Runs from dock to electrical panel at north end of site. <br /> <br />Q8. Bid items 10, reconnect 2" electrical conduits and services not shown in the plans. can you provide <br />locations and detail? <br />A8. Same as #7 <br /> <br />Q9. Bid items 11, removal 2" and replacement of water service to dock not shown in the plans. Can you <br />provide locations and detail? <br />A9. Runs under dock and has to be reworked with seawall construction. <br /> <br />Q10. Bid item 13 backfill. Is this item for #57 stone only? or do we provide backfill upland? if upland, is <br />there a quantity? <br />A10. #57 backfill is immediately behind the new concrete panels as needed, assume 3’ wide x 12’ deep <br />trench behind panels. Approx. 250 CY. Upland backfill beyond immediately behind concrete panels as <br />described would fall under the civil scope. <br /> <br />Q11. Bid item 14. are we to assume this is for the signs called out on plan sheet CM-2.0. Manatee <br />education sign, manatee awareness sign, help save protect manatee life sign, manatee awareness sign? <br />If so, please provide a detail for these signs. <br />A11. Standard FDEP signage. <br /> <br />Q12. Is there a manual or engineering standard for seawalls in Sunny Isles Beach? <br />A12. No <br /> <br />Q13. Is there a continuing contract list for contractors, architects, or engineers? <br />A13. Yes <br /> <br />Q14. Please confirm the anticipated start date for this project. <br />A14. June, pending permit approvals. <br /> <br />Q15. Please confirm that staging area will be provided to the contractor. <br />A15. Site staging will be available. <br /> <br />Q16. Please confirm that work may be performed from either land or barge. <br />A16. Land is preferred due to existing dock. <br /> <br />Q17. The existing dock is sitting on 4x4s. Please confirm if pile(s) will need to be installed (see photos <br />below). Or will the dock sit on top of the new concrete cap? <br />A17. Will sit on top of the seawall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.