My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Unlimited Barge
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-04-01) Bella Vista Seawall Replacement
>
Responses
>
Unlimited Barge - NON-RESPONSIVE
>
Unlimited Barge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 12:11:23 PM
Creation date
10/7/2025 12:10:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aldana Owner of Unilimited Bare Solutions Sole Proprietorshi <br />6. Has your company ever been debarred or terminated for default on a government contract? Has <br />an agency (Owner) submitted a claim against your performance bond with the surety company? <br />No <br />7. Identify your debris disposal pian. <br />- �-- [�Clld v15[a seawau SUU t_F sortin cancrete, steel, and <br />organic debris on barges using cranes. Debris will be transported via 2-3 weekly barge trips to <br />-approve an i s e.g., iami- a e Resources ecoveryan recyc ing centers (e.g., All <br />nce, with dispos; <br />8. Bidder must list any exceptions taken to the terms and condition in this ITB. <br />n/a <br />9. Discuss what strategies the submitter will utilize to keep this project on schedule, considering <br />long lead-times on fabrication. <br />Unlimited Bare will maintain the Bella Vista <br />schedule by pre-orderin <br />fabricated materials (e.g. concrete panels, steel piles) upon contract award <br />to mitigate long lead times. We will use our barge fleet for efficient material <br />transport, coordinate with suppliers for expedited delivery, and allocate dedicated <br />equipment and crew to ensure concurrent demolition and construction, targeting completing with <br />180 days. <br />10. Discuss strategies the submitter will implement to ensure the project is kept on budget. <br />Unlimited Barge will keep the Bella Vista project on budget by securing fixed-price supplier contract. <br />or ma erra s, op imizmg Uc11qE;-bds6cJ opera ions o re uce ranspo cos s, an c osely monitoring <br />e planning and <br />
The URL can be used to link to this page
Your browser does not support the video tag.