My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Unlimited Barge
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-04-01) Bella Vista Seawall Replacement
>
Responses
>
Unlimited Barge - NON-RESPONSIVE
>
Unlimited Barge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 12:11:23 PM
Creation date
10/7/2025 12:10:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Have you personally inspected the plans and location, are there any concerns that may impede <br />your performance on this project? No <br />12. Describe the submitter's attributes, which make the submitter best -suited for this project. <br />With over seven years of marine construction experience, is best suited for the Bella Vista Seaw, <br />Replacement due to its specialized barge fleet, proven expertise and ability to manage debris an <br />fabrication lead times. <br />13. Proposed timeframe to complete project (time is of the essence): <br />Unlimited Barge proposes to complete the <br />within 180 calendar days from the notice to <br />proceed, including 30-45 days for demolition and debris removal, 90-100 days for pile driving ar <br />seawall construction, and 35-45 days for site restoration, accounting for a ncation lead times. <br />C�iLZ•I�i�s�•Ii`] <br />
The URL can be used to link to this page
Your browser does not support the video tag.