My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
YC Group, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-04-01) Bella Vista Seawall Replacement
>
Responses
>
YC Group LLC (3)
>
YC Group, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 12:13:13 PM
Creation date
10/7/2025 12:12:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 18 of 22 <br /> <br />➢ Although the scaffolding can be anchored to stationay points using equivalent to at least 1 in <br />diameter first grade manila rope although a system of rigid connections is the preferred <br />method. <br /> <br />➢ All sections of the tubular scaffolding are joined together with clamps and metal diagonals. <br />➢ Extinguishers <br />➢ The extinguishers must be adapted to the extinguishing agent potential size of the fire to be <br />extinguished and must be checked periodically. <br /> <br />Machinery <br />➢ All machinery must be equipped with the legally-mandated safety devices and protective <br />elements when it arrives on site. <br /> <br />➢ Generators must be soundproof and may olnly be operated by specialized and authorized <br />personnel. <br /> <br />➢ The engines and tracks of all self-propelled formwork and shuttering machinery must be <br />grounded and must be checked periodically to ensure that they are in perfect working order. <br />Only authorized personnel may operate such machinery. <br /> <br />2.0.- Terms and Conditions <br /> <br />2.1.- Medical Facilities <br /> <br />First-aid kits must be checked monthly, replacing any times that have been used. <br /> <br />All items in first-aid kits must be properly labelled. All bottles must indicate whether or not the <br />contents are toxic. <br /> <br />2.2. – Protection of the Workplace <br /> <br />Acceptable measures for protection <br />➢ 2.2.1 - Trench shield <br />➢ 2.2.2 - Sloping <br />➢ 2.2.3 – Benching <br />➢ 2.2.4 – Soil Types <br />➢ 2.2.5 - Railing <br />➢ 2.2.6 - Lifeline <br /> <br />Competent person will indicate what safety measures will be taken after soil type is determine. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.