Laserfiche WebLink
August 13, 2025 / Page 5 of 8 <br />11723.14 — SR 826 Service Road Parking Lot - City of Sunny Isles Beach <br />City of Sunny Isles Beach <br />NOTE: This task includes, one (1) drawing revision (after the release of 100% Construction <br />Drawings) in response to City comments. If additional revisions are required, as a result of <br />CLIENT and/or Design Team changes, a contract addendum will be submitted to the CLIENT. * <br />NOTE: Upon preliminary review, it is assumed that no arborist reports will be required for this <br />project. If determined this is required, a contract addendum will be submitted to the CLIENT. <br />Task 702 Landscape Permitting <br />KEITH will apply for and coordinate the FDOT Landscape Permit and Maintenance Agreement <br />(MMOA). As a part of this task KEITH will allow up to two (2) drawing revisions in response to <br />agency comments. <br />Required Permits <br />• Florida Department of Transportation — FDOT Landscape Permit and Maintenance <br />Agreement <br />NOTE: Otherlandscape specific permits are not anticipated and are NOT included in this task. If <br />additional permits are required a contract addendum will be submitted to the CLIENT. <br />Task 801 Construction Administration <br />Construction Observation for Certification <br />KEITH will provide construction services to ensure the integrity of the design intent and certify to <br />the CLIENT and other jurisdictional agencies that the construction work has been completed in <br />substantial compliance with the approved documents and permits. Any revisions or deviations to <br />original construction documents, including but not limited to, substitutions and/or unforeseen <br />conditions may impact schedule and will require additional fees. Services included are described <br />as follows and are anticipated to take place in the time frame indicated in the "SCHEDULE" for <br />CONSTRUCTION ADMINISTRATION SERVICES below. <br />Shop Drawing Reviews <br />KEITH will review required shop drawings, such as samples, product data, plant photos, and <br />calculations, which the selected contractor is required to submit for review. This review will only <br />be for conformance with the design concept of the project and compliance with the information <br />provided on the design drawings and specifications. Such review will not extend to methods, <br />means, techniques, construction sequence(s) or procedures, or to safety precautions and related <br />programs. KEITH will also determine the acceptability, subject to CLIENT approval, of substitute <br />materials and equipment proposed by contractors. <br />Periodic Site Visits and Construction Observation <br />KEITH will visit the Project at intervals appropriate to the various stages of construction, as KEITH <br />deems necessary to observe as an experienced and qualified design professional to review the <br />progress and quality of the various aspects of the contractor's work. <br />KEITH will coordinate and attend one (1) Pre -construction Meetings. If required by the CLIENT, <br />KEITH will attend or participate in CLIENT scheduled coordination and progress meetings or <br />telephone conferences. <br />The Contractor will coordinate through KEITH the scheduling of testing. KEITH will represent the <br />CLIENT in performing periodic observation of construction as necessary to confirm construction <br />is in accordance with the approved plans. <br />KEITH will provide additional construction observations at the request of the CLIENT / Permit <br />agencies due to unforeseen conditions or other circumstances. <br />Engineering Inspired Design. <br />1 <br />