My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3887
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 10:36:50 AM
Creation date
10/23/2025 9:25:12 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3887
Date (mm/dd/yyyy)
09/18/2025
Description
Approving Agrmnt w/ Keith & Assoc., Inc, to Provide Landscape Architecture, & Electrical Engineering Svcs to design Parking Lot Sunny Isles Blvd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.5 The City shall perform those duties <br />expeditiously as may reasonably be <br />Consultant's services and of the work. <br />set forth in Sections 3.1 through 3.4 as <br />necessary for the orderly progress of the <br />3.6 The City's review of any documents prepared by the Consultant or its subconsultants <br />shall be solely for the purpose of determining whether such documents are generally <br />consistent with the City's construction program and intent. No review of such <br />documents shall relieve the Consultant of its responsibility for the accuracy, adequacy, <br />fitness, suitability and coordination of its work product. <br />SECTION 4 CONSTRUCTION COSTS <br />4.1 If the cost of construction exceeds the cost agreed upon by the City by more than 5% <br />of the lowest bona fide bid or negotiated proposal, the City may (1) give written <br />approval of an increase in such fixed limit, (2) authorize rebidding or renegotiating of <br />the Project, (3) terminate the Project and this Agreement in accordance herewith, or (4) <br />cooperate in revising the Project scope or quality, or both, as required to reduce the <br />construction cost. In the case of (4), the Consultant, without additional charge to the <br />City, shall consult with the City and shall revise and modify the drawings and <br />specifications as necessary to achieve compliance with the cost agreed upon by the <br />City. Absent negligence on the part of the Consultant in making its estimates of probable <br />construction cost, providing such modifications and revisions shall be the limit of the <br />Consultant's responsibility arising from the establishment of such construction costs, <br />and having done so, the Consultant shall be entitled to compensation for all other <br />services performed, in accordance with this Agreement. <br />SECTION 5 BASIS OF COMPENSATION <br />5.1 The City shall compensate the Consultant for an amount of Seventy -Nine Thousand Six <br />Hundred Thirty Dollars and No Cents ($79,630.00), plus an amount of Four Thousand <br />Three Hundred Seventy Dollars and No Cents ($4,370.00) as contingency, if necessary, for <br />a total not -to -exceed amount of Eighty -Four Thousand Dollars and No Cents ($84,000.00), <br />based on services rendered pursuant to Sections 2.3 through 2.5 and EXHIBIT "I," Scope <br />of Services. Billing for each phase shall not exceed the amount allocated to each phase. <br />5.2 Payment to the Consultant of the sum set forth in Section 5.1 shall be allocated for work <br />completed for each of the following tasks: <br />Task 001 <br />— Team Meetings and Meetings w/Permit Authorities ................. $3,000.00 <br />Task 401 <br />— Preliminary Design Development Plan Revisions ..................... $3,000.00 <br />Task 402 <br />— Construction Documents — Final Engineering ........................... $7,600.00 <br />Task 403 <br />— Engineering Permitting............................................................ <br />$11,700.00 <br />Task 501 <br />— Electrical Construction Documents - SGM................................ <br />$6,330.00 <br />Task 701 <br />— Construction Documents — Final Landscape .............................. <br />$5,000.00 <br />Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.