My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 25-09-01 183RD STREET AND COLLINS AVENUE LEFT TURN CONVERSION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-09-01) 183rd Street & Collins Ave Left Turn Conversion
>
ITB 25-09-01 183RD STREET AND COLLINS AVENUE LEFT TURN CONVERSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 12:36:22 PM
Creation date
11/3/2025 12:35:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />14 <br />ITB 25-09-01 183RD STREET CONVERSION LEFT TURN <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />the list shall constitute acceptance of such subcontractor. After acceptance, no subcontractor <br />shall be changed without written approval by the City and Engineer. <br /> <br />2.8 FIRM BID PRICE <br /> <br />If the Bidder is awarded a contract under this solicitation, the prices proposed by the Bidder shall <br />remain fixed and firm during the term of the contract. <br /> <br />2.9 PERFORMANCE AND PAYMENT BOND / PUBLIC CONSTRUCTION BOND <br /> <br />The City of Sunny Isles Beach shall require the successful Bidder to furnish a Performance and <br />Payment Bond / Public Construction Bond, in the amount of 100% of the total Bid Price, with the <br />City of Sunny Isles Beach as the Obligee, as security for the faithful performance of the Contract <br />and for the payment of all persons performing labor or furnishing materials in connection <br />herewith within ten (10) calendar days after issuance of the Notice of Award by the City. The <br />Performance and Payment Bond shall continue in effect through the contract term. The bonds <br />shall be with a surety company authorized to do business in the State of Florida and having been <br />in business with a record of successful continuous operation for at least five (5) years. <br /> <br />The Performance Bond shall guarantee all work and materials furnished under the Contract <br />including losses resulting from defects in the materials or improper performance of Work under <br />the Contract that may appear or be discovered during performance of the Work or during any <br />applicable warranty period after completion of all Work, and for latent defects, during the time <br />period agreed upon. <br /> <br />2.10 DELIVERY & PROTECTION OF MATERIAL AND EQUIPMENT <br />Requirements warrant that lead-times for furnishing and delivery of equipment and supplies will <br />need to be considered to accommodate the project timeframe. Due to long fabrication and <br />delivery lead times, Contractor shall provide to the City a list of equipment required to maintain <br />orderly progress of the Work and those required to order immediately upon NTP. <br /> <br />All material must be F.O.B. destination City of Sunny Isles Beach. The Contractor is solely liable <br />and responsible for the purchase, delivery, and installation of all materials and equipment. The <br />Contractor will make all arrangements in regards to delivery, storage, installation, and warranty <br />requirements. Contractor will be solely liable for receiving, inspecting, accepting, and replacing <br />any damaged materials or equipment and filing any and all claim with suppliers or transporters. <br />Contractor is responsible for the protection of all materials and equipment from adverse weather <br />conditions, damage, deterioration, and theft until the Work has been accepted by the City. <br /> <br />All bidders shall quote prices based on furnished and installed materials. Bidder shall hold title to <br />the goods until such time as they are delivered to, and accepted by, an authorized City <br />representative. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.