My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 25-09-01 183RD STREET AND COLLINS AVENUE LEFT TURN CONVERSION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-09-01) 183rd Street & Collins Ave Left Turn Conversion
>
ITB 25-09-01 183RD STREET AND COLLINS AVENUE LEFT TURN CONVERSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 12:36:22 PM
Creation date
11/3/2025 12:35:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />13 <br />ITB 25-09-01 183RD STREET CONVERSION LEFT TURN <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />2.6 METHOD OF AWARD <br /> <br />The term “lowest responsible and responsive Bidder” as used herein shall mean the Bidder whose <br />bid is the lowest of those Bidders possessing the skill, ability, and integrity necessary for the <br />faithful performance of the work, whose bid best serves the interests of and represents the best <br />value to the City, as determined by the City Commission and/or the City Manager. The bidder will <br />also be evaluated as part of their “responsibleness” on their quality control plan, safety plan, and <br />proposed project schedule. <br /> <br />The City reserves the right to utilize any combination of the base bid, and add alternates as they <br />so desire to achieve the proper balance between the required improvements, desired <br />improvements, and the City’s available project budget. The City reserves the right to request per <br />unit/each pricing of materials listed on the bid form for clarification or to purchase additional <br />materials. <br /> <br />Bidders will be evaluated by relevant experience, preferably with government agencies, <br />successful past performance, no conflicts of interest, approach to the project, and whose bid best <br />serves the interest of and represents the best value to the City in conformity with the applicable <br />criteria. The City Manager may also reject all proposals received. Section 62-8 of the City Code <br />provides that the City may consider the following: <br /> <br /> The ability, capacity, and skill of the vendor to perform the Contract. <br /> The character, integrity, reputation, judgment, experience, and efficiency of the vendor. <br /> The quality of performance of previous contracts with the City and references. <br /> The previous and existing compliance by the vendor with laws and ordinances relating to <br />the Contract. <br /> <br />The City also reserves the right to waive minor variations to specifications (interpretation of minor <br />variations will be made by applicable City Procurement personnel). In addition, the City reserves <br />the right to cancel any contract by giving thirty (30) days’ written notice. The City reserves the <br />right to negotiate the type and cost of specific types of services to be purchased. <br /> <br />2.7 SUB-CONTRACTORS <br /> <br />If one or more subcontractors are to be used, the subcontractor must be clearly identified and <br />noted in the submittal when it is submitted. The City must approve any changes in the use of <br />subcontractors in advance and in writing. No such approval will be construed as making the City <br />a party to such subcontract, or subjecting the City to liability of any kind to any subcontractor. No <br />subcontractor will under any circumstances relieve the Proposer of its liability and obligation <br />under any resulting contract. Subcontractor is subject to the same contractual conditions as is the <br />Contractor. <br /> <br />The City/City’s Representative shall promptly notify the Contractor, in writing, if either the City or <br />Engineer, after due investigation, has reasonable objections to any subcontractor on said list and <br />does not accept them. Failure of the City or Engineer to make objection to any subcontractor on
The URL can be used to link to this page
Your browser does not support the video tag.