Laserfiche WebLink
<br /> <br />12 <br />ITB 25-09-01 183RD STREET CONVERSION LEFT TURN <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />2.3 NON-MANDATORY PRE-BID MEETING FOLLOWED BY A SITE-VISIT <br /> <br />A pre-bid conference will be held on FRIDAY, OCTOBER 10, 2025 AT 11:00 AM to discuss the <br />special conditions and specifications included within this solicitation. It is strongly recommended <br />for bidders interested in bidding to attend the Pre-Bid Meeting as a tool to be successful in <br />responding to the City’s project. <br /> <br />1ST Location: Government Center, 1st Floor Conference Room, 18070 Collins Government Center <br />Sunny Isles Beach, FL 33160 <br /> <br />2.4 EXAMINATION OF SITE <br /> <br />Each bidder shall visit the site of the proposed work before submitting a bid and shall fully <br />familiarize themselves with conditions relating to construction and labor so that he or she may <br />fully understand the facilities, difficulties, and restrictions attending the execution of work under <br />the Contract. It will be assumed that the Bidder has investigated and is satisfied as to the <br />conditions of work to be performed and materials to be furnished and shall base Bid on their own <br />opinion of the conditions likely to be encountered, and for the bid price must assume all risk of <br />variance, by whomsoever made in any computation or statement of amounts or quantities <br />necessary to fully complete the work in strict compliance with the Contract Documents. <br /> <br />2.5 PROJECT AND CONTRACT TIME AND LIQUIDATED DAMAGES <br /> <br />The Contractor shall neither commence any work, nor enter a City work premise, until a written <br />Notice to Proceed (NTP) from the City directing the Contractor to proceed with the work has been <br />received by the Contractor from the City Manager or designee; provided however, that such <br />notification shall be superseded by any emergency work that may be required in accordance with <br />provisions included elsewhere in this solicitation and resultant contract. In addition to the written <br />NTP, the Contractor must supply the City with the required insurance and bond documents. The <br />Project shall be substantially completed within one-hundred and fifty (150) calendar days from <br />the Project initiation specified in the Notice to Proceed and final completion shall be thirty (30) <br />calendar days after Substantial Completion. The total one-hundred and eighty (180) calendar <br />days include weekend days and holidays. <br /> <br />For the purpose of this Project, Final Completion shall be defined at that point after which the City <br />Engineer or their representative, have made and approved the Final Inspection and the Punch List <br />has been completed, and all deliverables have been provided to the City. <br /> <br />Failure to complete all the work within the Project Term specified above, including any extension <br />granted in writing by the City, shall obligate the Contractor to pay the City, as liquidated damages <br />and not as a penalty, an amount equal to Five Dollars ($1,000) for each calendar day of delay in <br />the completion of all the work. If any liquidated damages are unpaid by the Contractor, the City <br />shall be entitled to deduct these unpaid liquidated damages from the monies due the Contractor. <br /> <br />