Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />One Hundred Eighty -Six Thousand Nine Hundred Fifty -Four Dollars and Fifty -Six Cents <br />($186,954.56); <br />NOW THEREFORE, in consideration of the promises and the mutual covenants herein <br />name, the parties agree as follows: <br />TERMS <br />1. RECITALS. The Recitals set forth above are hereby incorporated into this Agreement <br />and made a part hereof for reference. <br />2. THE CONTRACT DOCUMENTS. The Contract Documents consist of this Agreement, <br />as well as the terms and conditions of the GSA Solicitation No. 47QSMD20R0001 and awarded <br />agreement with Contractor (Contract Number GS-07F-0031 W) and Contractor's GSA Authorized <br />Federal Supply Schedule Price List, which are specifically incorporated herein and made a part <br />hereof as Attachment `B," as well as Contractor's Proposal, attached and incorporated herein as <br />Attachment "A" (hereinafter referred to collectively as "Contract Documents"). In the event of any <br />conflict between or among the contract documents or any ambiguity or missing specifications or <br />instruction, the following priority is established: <br />A. First, this Agreement Between the City of Sunny Isles Beach and Millenium Products, <br />Inc.— Contract No. 2025-7081-4. <br />B. Second, the terms and conditions of GSA Solicitation No. 47QSMD20R0001 and <br />Contract Number GS-07F-0031 W), including the Solicitation Document, and GSA's <br />Authorized Federal Supply Schedule Price List. <br />C. Third, Contractor's Proposal, appended as Attachment "A." <br />3. SERVICES. Contractor shall provide equipment and services to the City pursuant to <br />the terms and conditions set forth in the Contract Documents, to specifically include, but not <br />limited to, installing closed-circuit television (CCTV) cameras in City's Intracoastal Sports <br />Park, as more particularly described in Attachment "A." <br />Final Clean-0: At all times, Contractor shall keep the premises free from accumulation of waste <br />materials or rubbish caused by its employees or the Work. Upon final completion of the Work and <br />before acceptance and final payment shall be made, Contractor shall clean and remove from the <br />property, all surplus and discarded materials, rubbish, and equipment. Contractor is responsible <br />for hauling all construction debris., Contractor shall restore in an acceptable manner all property <br />which has been damaged as a result of the Work. The Contractor shall leave entire area and vicinity <br />unobstructed and in a neat and presentable condition. <br />Damage to Property: If any property is damaged while Contractor is performing the Work, it shall <br />be repaired or replaced at the sole expense of Contractor in a manner acceptable to the City prior <br />to the final acceptance of the Work. If the work site has any pre-existing damage, the Contractor <br />shall notify the Public Works/Capital Projects Department in writing. Failure to do so shall obligate <br />Contractor to make repairs as set forth herein. <br />The Services shall be performed by Contractor to the full satisfaction of the City. Contractor agrees <br />to furnish all labor and material in a good and workmanlike and professional manner to perform <br />MILLENIUM PRODUCTS, INC. <br />