Laserfiche WebLink
parties. The City's designated representative for the receipt of any such communications, or copies <br />of same, is Todd Nobles, Project Manager, whose address is City of Sunny Isles Beach, 18070 Collins <br />Avenue, Sunny Isles Beach FL 33160. The City reserves the right to change its designated <br />representative upon written notice to the Contractor and Engineer / Architect. <br />8.2.3. The Engineer / Architect shall be the initial interpreter of the requirements of the <br />drawings and specifications and the judge of the performance there under by the Contractor. The <br />Engineer / Architect shall render written or graphic interpretations necessary for the proper <br />execution or progress of the Work with reasonable promptness on request of the Contractor. <br />8.2.4. The Engineer / Architect will review the Contractor's Invoice and will certify to the <br />City for payment to the Contractor, those amounts then due the Contractor as provided in this <br />Contract. <br />8.2.5. The Engineer / Architect shall have authority to reject Work which is defective or <br />does not conform to the requirements of this Contract. If the Engineer / Architect deems it <br />necessary or advisable, the Engineer / Architect shall have authority to require additional <br />inspection or testing of the Work for compliance with Contract requirements. <br />8.2.6. The Engineer / Architect will review and approve, or take other appropriate action <br />as necessary, concerning the Contractor's submittals including Shop Drawings, Product Data and <br />Samples. Such review, approval or other action shall be for the sole purpose of determining <br />conformance with the design concept and information given through the Contract Documents. <br />8.2.7. The Engineer / Architect will prepare Change Orders and may authorize minor <br />changes in the Work upon approval from the City by Field Order as provided elsewhere herein. <br />8.2.8. The Engineer / Architect shall, upon written request from the Contractor, conduct <br />inspections to determine the date of Substantial Completion and the date of Final Completion, will <br />receive and forward to the City for the City's review and records, written warranties and related <br />documents required by this Contract and will issue a final Certificate for Payment upon compliance <br />with the requirements of this Contract. <br />8.2.9. The Contractor agrees, acknowledges, and warrants that it has no third party <br />beneficiary rights, or other rights, arising out of any contract by and between the City and the <br />Engineer / Architect and, in the event of any conflict between the terms and provisions of the <br />contract by and between the City and the Engineer / Architect and this Contract, the terms of this <br />Contract shall control with respect to the Contractor. <br />8.2.10. If the Contractor fails any inspection which requires a re -inspection by the Engineer <br />/ Architect or any of its design consultants, the Contractor shall bear the cost of such repeat <br />inspection(s) which cost may be deducted by the City from any sums otherwise due the Contractor. <br />Page 20 of 42 <br />