Laserfiche WebLink
December 5, 2025 / Page 2 of 5 <br />Intracoastal Sports Court / Project #11723.02 <br />City of Sunny Isles <br />Contract Addendum #03 <br />LANDSCAPE ARCHITECTURE SERVICES <br />Task 707 FDOT Landscape Permitting <br />KEITH will apply for and coordinate the FDOT Landscape Permit and Maintenance Agreement <br />(MMOA) to replace the concrete with pavers in the right-of-way on the corner of Collins Ave and <br />Bay View Drive, highlighted below. As a part of this task KEITH will allow up to two (2) drawing <br />revisions in response to agency comments. <br />Required Permits <br />• Florida Department of Transportation — FDOT Landscape Permit and Maintenance <br />Agreement <br />NOTE: Other landscape specific permits are not anticipated and are NOT included in this task. If <br />additional permits are required a contract addendum will be submitted to the CITY. <br />CONSTRUCTION ADMINISTRATION SERVICES <br />Task 803 Additional Construction Administration <br />KEITH will continue to perform Construction Administration services for the PROJECT as defined <br />by the established Construction Administration scope detailed below. <br />Construction Observation for Certification <br />KEITH will provide construction services to ensure the integrity of the design intent and certify to <br />the CITY and other jurisdictional agencies that the construction work has been completed in <br />substantial compliance with the approved documents and permits. Any revisions or deviations to <br />original construction documents, including but not limited to, substitutions and/or unforeseen <br />conditions may impact schedule and will require additional fees. Services included are described <br />as follows and are anticipated to take place in the time frame indicated in the "SCHEDULE" for <br />CONSTRUCTION ADMINISTRATION SERVICES below. <br />Shop Drawing Reviews <br />KEITH will review required shop drawings, such as samples, product data, plant photos, and <br />calculations, which the selected contractor is required to submit for review. This review will only <br />be for conformance with the design concept of the project and compliance with the information <br />provided on the design drawings and specifications. Such review will not extend to methods, <br />means, techniques, construction sequence(s) or procedures, or to safety precautions and related <br />programs. KEITH will also determine the acceptability, subject to CITY approval, of substitute <br />materials and equipment proposed by contractors. <br />Engineering Inspired Design. <br />