My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3944
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3944
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2026 11:55:52 AM
Creation date
1/29/2026 9:18:59 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3944
Date (mm/dd/yyyy)
01/15/2026
Description
Approving Project Agrmnt w/ Keith & Assoc., d/b/a Keith to provide construction svcs of the Intracoastal Sports Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 5, 2025 / Page 3 of 5 <br />Intracoastal Sports Court / Project #11723.02 <br />City of Sunny Isles <br />Contract Addendum #03 <br />Periodic Site Visits and Construction Observation <br />KEITH will visit the Project at intervals appropriate to the various stages of construction, as KEITH <br />deems necessary to observe as an experienced and qualified design professional to review the <br />progress and quality of the various aspects of the contractor's work. <br />KEITH will coordinate and attend one (1) Pre -construction Meeting. If required by the CITY, <br />KEITH will attend or participate in CITY scheduled coordination and progress meetings or <br />telephone conferences. <br />The Contractor will coordinate through KEITH the scheduling of testing. KEITH will represent the <br />CITY in performing periodic observation of construction as necessary to confirm construction is <br />in accordance with the approved plans. <br />KEITH will provide additional construction observations at the request of the CITY / Permit <br />agencies due to unforeseen conditions or other circumstances. <br />Additional construction observation services, Re -tests and failed inspections, will be invoiced on <br />a time and material basis in accordance with KEITH Professional Service Fee schedule <br />(attached). <br />Issue Clarifications <br />KEITH will issue all instructions and revisions of the CITY to Contractor(s); issue necessary <br />interpretations and clarifications of the contract documents; have authority, to require special <br />inspection or testing of the work; act as initial interpreter of the requirements of the contract <br />documents and judge of the acceptability of the work there under, and make decisions on all <br />claims of the CITY and contractor(s) relating to the acceptability of the work or the interpretation <br />of the requirements of the contract documents pertaining to the execution and progress of the <br />work. <br />Meetings and Conference Calls <br />KEITH will attend and/ or participate in periodic project meetings and conference calls as <br />requested by the CITY. KEITH will review requests for information prepared by the Contractor <br />and respond accordingly to all parties. KEITH will prepare drawings and supplemental information <br />needed to address the contractor's request for information. <br />As-Builts Review <br />KEITH will review the record drawings (as-builts) to ensure substantial conformance to the <br />permitted plans twice. Additional reviews due to non -compliant As-builts submitted by the <br />contractor may impact schedule and will require additional fees. The contractor will be expected <br />to have the as-builts revised in accordance with all comments. <br />Final Inspections <br />KEITH will participate with the CITY's representative, in a semi-final inspection for the purpose of <br />determining if the project is substantially complete and participate in the preparation of a written <br />"Punch List" of any defective or deficient items. <br />KEITH will participate in a final inspection together with CITY and contractor representatives to <br />verify "Punch List" items are complete, and in substantial conformance to the permitted plans. <br />Additional inspections due to non -compliant Punch List item(s), may impact the schedule and will <br />require additional fees. <br />Upon satisfactory completion of the final inspection, KEITH will certify the work has been <br />completed in substantial conformance to the permitted plans, subject to any conditions therein <br />expressed. <br />0 Engineering Inspired Design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.