Laserfiche WebLink
DEMOLITION/ CONSTRUCTION STAGING AND TRAFFIC MANAGEMENT PLANS 2019 <br />II. Demolition Work/Excavation and Grading/Concrete Placement Work <br />Contractor Information: Please include name, company, address, phone number, <br />email, cell phone number. <br />Demolition Contractor has not been determined as of this application. <br />Project Location: 18325 Collins Ave, Sunny Isles Beach, FL 33160 <br />Estimated Start Date: January 2026 <br />Estimated Completion Date: March 2026 <br />Hours of Operation: Construction hours mandated by City of Sunny Isles Beach, plus certain <br />extended hours, as requested, and approved by the City <br />Project Task: Describe project; include equipment to be used. <br />Note: Copy of liability insurance with the City of Sunny Isles Beach as an additional <br />insured. Project is demolition of existing structure and construction of new modular sales center <br />for future development. Insurance Certificates will be provided with City of Sunny Isles <br />Beach listed as an additional insured. <br />Additional Information (as applicable to project) Refer to Attachment "A-1" - Site Plan (L-200) <br />by Enea Architects) and Attachment A-2 - <br />De o SitPan SC-A-1(by F P�rchitects) <br />Truck Route: Describe truck routes (attach route map), Include number of rucKKs and <br />staging location. Refer to Attachment "13-1" -Construction Staging Plan <br />and Traffic Management Plan (Drawing A0.1). <br />Material Storage Location: Describe the location for material storage (if needed). Any <br />removal or relocation of sand, must be approved separately. <br />Refer to Attachment "13-1" - Construction Staging Plan <br />and Traffic Management Plan (Drawing A0.1). <br />Construction Trailer: Will a construction trailer be used? If so, show location? <br />No Construction Trailer is required for this Site. <br />Traffic Control. Will this operation require occupying any traffic lanes, parking lanes, <br />beachwalks or any other public right -of way? If yes, closures shall be per the regulations <br />described in the Maintenance of Traffic (MOT) from the Florida Department of <br />Transportation (FDOT). Please note that a Lane Closure Permit from the Code <br />Compliance Department must be obtained prior to public right-of-way use. <br />No lane closures are expected during demolition activities. Sidewalk / Lane closures may be <br />required for the delivery / installation / are expected for the installation of proposed utilities and <br />required approvals and lane closure permit will be obtained prior to public right-of-way use. <br />414 <br />