My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 26-Z-224
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2026
>
Zoning Resolution 26-Z-224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:48:35 PM
Creation date
3/9/2026 10:40:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
26-Z-224
Date (mm/dd/yyyy)
02/19/2026
Description
Approving the Zoning Appl for conditional use approval (PZ2025-15), submitted by Dezer Blue Grass, LLC, allow off-site Temp Sales Cntr on 18325 Collin
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION/ CONSTRUCTION STAGING AND TRAFFIC MANAGEMENT PLANS 2019 <br />II. On -going construction <br />Contractor Information: Please include name, company, address, phone number, <br />email, cell phone number. <br />Refer to same responses for this Section II as in previous Section II in this application (page 3). <br />Project Location: 18325 Collins Ave, Sunny Isles Beach, FL 33160 <br />Estimated Start Date: October 2026 <br />Estimated Completion Date: February 2026 <br />Hours of Operation: Construction hours mandated by City of Sunny Isles Beach, plus certain <br />extended hours, as requested, and approved by the City. <br />Project Task: Describe project; include equipment to be used. <br />Note: Copy of liability insurance with the City of Sunny Isles Beach as an additional <br />insured. <br />Traffic Control: Will this operation require occupying any traffic lanes, parking lanes, <br />beachwalks or any other public right -of way? If yes, closures shall be per the regulations <br />described in the Maintenance of Traffic (MOT) from the Florida Department of <br />Transportation (FDOT). Please note that a Lane Closure Permit from the Code <br />Compliance Department must be obtained prior to public right-of-way use. <br />Parking: Indicate the number of workers and the areas where their vehicles will be parked <br />through the duration of this phase of the project. Any parking displacement must be <br />addressed accordingly and in advance. <br />Clean-up: Describe the measures that will be taken to ensure that the work site and <br />public right-of-way will be maintained (including dust control, swale on driveways to <br />prevent water leaks to the street, gutter buddies, rocks at driveways, etc.) <br />Fencing: Construction fencing must be constructed of durable material, and additional <br />silt fencing for additional protection. Gates should be steady and properly secure during <br />non -working hours. <br />Provide erosion sediment control plans, if applicable. <br />Material Storage Location: Describe the location for material storage (if needed). Any <br />removal or relocation of sand, must be approved separately. <br />5 <br />416 <br />
The URL can be used to link to this page
Your browser does not support the video tag.