My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 26-Z-221
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2026
>
Zoning Resolution 26-Z-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 11:53:50 AM
Creation date
3/17/2026 12:05:20 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
26-Z-221
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Site Plan Appl (PZ2025-08) MB RE Investments, LLC for "Miami Beach Club" (62) Story Residential Condo Tower w/ 524,212.8 Sq. Ft of FAR.
Supplemental fields
Comment
Heard with Companinon Reso No.: 2026-3963; Item 9A.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley»> Horn ' Traffic Impact Analysis <br />INTERSECTION CAPACITY ANALYSIS <br />The study area intersection operating conditions were analyzed for three (3) scenarios (existing <br />conditions, future background conditions, and future total conditions) using Trafficware's <br />SYNCHRO software, which applies methodologies outlined in the Transportation Research Board's <br />(TRB's) Highway Capacity Manual (HCM) 2000/71h Editions. Synchro worksheets for the study <br />intersections are included in AppendixJ. <br />A summary of the intersection analyses for the A.M. and P.M. peak hours is presented in Table 3. <br />As Table 3 indicates, all study intersections are expected to operate at overall adopted level of <br />service (LOS) E+20% or better during the A.M. and P.M. peak hours under all analysis scenarios. <br />Table 3: Intersection Capacity Analysis Results <br />ID <br />Intersection <br />Traffic Control <br />Overall <br />I Approach LOS/Delay <br />I EB 1 WB NB SB <br />LOS/Delay <br />Existing Conditions (Future Background Conditions) [Future Total Conditions] <br />A.M. Peak Hour <br />1 <br />SR 856/William Lehman Causeway and <br />Signalized (4) <br />C/22.9sec <br />( C/24.0 sec) <br />D <br />(D) <br />D <br />(D) <br />C <br />(C) <br />B <br />(B) <br />SR A1A/Collins Avenue <br />[C/24.2 sec] <br />[D] <br />[D] <br />[C] <br />[B] <br />2 <br />SR A1A/Collins Avenue and <br />One -Way <br />(1) <br />B <br />(B) <br />A <br />(A) <br />(z) <br />(3) <br />Project Driveway <br />Stop Control <br />[B] <br />[B] <br />P.M. Peak Hour <br />1 <br />SR 856/William Lehman Causeway and <br />Signalized (4) <br />C/34.2 sec <br />(D/37.3 sec) <br />E <br />(E) <br />E <br />(E) <br />D <br />(D) <br />B <br />(B) <br />SR A1A/Collins Avenue <br />[D/37.6 sec] <br />[E] <br />[E] <br />[D] <br />[B] <br />2 <br />SR A1A/Collins Avenue and <br />One -Way <br />(1> <br />B <br />(B) <br />B <br />(B) <br />(z) <br />(3) <br />Project Driveway <br />Stop Control <br />[B] <br />[B] <br />Notes: (1) Overall intersection LOS is not defined, as intersection operates under two-way stop -control conditions. <br />(2) Approach operates under free -flow conditions. LOS is not defined. <br />(3) Approach does not exist. <br />(4) Intersection cannot be analyzed using HCM 71h Edition. Therefore, HCM 2000 was used instead. <br />K:\FTL_TTG\0N3800034- RDBH Su,,ylsles\Report\GtV&Sunny Isles Beach TIA 092025 Aces Page -20 September 2025 157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.