Laserfiche WebLink
January 15, 2026 <br />PZ2025-08 <br />§265 24:3 Level of Service Standards' y <br />Service <br />Required <br />Proposed <br />Roads <br />Provider: FDOT (Collins Avenue) <br />Traffic Impact Analysis prepared <br />by Kimley Horn dated 9/10/25 <br />Roadway segment LOS E for <br />states project will generate 68 <br />state and county roads <br />net new vehicle trips during <br />weekday AM peak hour and 64 <br />net new vehicle trips during the <br />weekday PM peak hour. The <br />roadway segment capacity <br />analysis indicates the study <br />segment is expected to operate <br />at LOS D or better during AM <br />and PM peak hours. <br />Sanitary Sewer <br />Provider: Miami Dade County <br />Letter of Availability from <br />Water and Sewer Department <br />MDWASD dated 12/15/25 <br />1 <br />confirms capacity and availability <br />102% average daily per capita <br />and is attached to the staff report <br />sewage system demand for <br />recedin 5 years <br />Potable Water <br />Provider: City of North Miami <br />Letter of Water Availability from <br />Beach <br />NMB Water dated 10/28/25 <br />confirms capacity and availability <br />144 gallons per capita per day at <br />and is attached to the staff report <br />a pressure of 40 pounds per <br />s uare inch <br />On -Site <br />Protection from flooding that <br />Preliminary Drainage Statement <br />Drainage <br />would result from one day <br />prepared by Kimley Horn dated <br />duration rain event from a ten <br />10/2/25 confirms on -site drainage <br />year storm <br />requirements are met and is <br />attached to the staff report <br />Solid Waste <br />Provider: WastePro USA <br />Letter from WastePro USA dated <br />12/2/25 confirms capacity and <br />7 lbs per multifamily unit and 2 <br />availability and is attached to the <br />lbs per meal per day for <br />staff report <br />restaurant <br />Page 5 of 18 <br />15 <br />