My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 26-Z-221
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2026
>
Zoning Resolution 26-Z-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2026 3:48:38 PM
Creation date
3/17/2026 12:05:20 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
26-Z-221
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Site Plan Appl (PZ2025-08) MB RE Investments, LLC for "Miami Beach Club" (62) Story Residential Condo Tower w/ 524,212.8 Sq. Ft of FAR.
Reference
Needs to be resigned by Atty
Supplemental fields
Comment
Heard with Companinon Reso No.: 2026-3963; Item 9A.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 15, 2026 <br />PZ2025-08 <br />IV. COMPREHENSIVE PLAN REVIEW <br />According to Policy 5A of the Future Land Use Element (FLUE), "All development orders <br />authorizing a new land use or development, or redevelopment... shall be consistent with <br />the goals, objectives, and policies of the Comprehensive Plan." <br />Policy 10B of the FLUE states, "Consistent with maintaining view corridors and promoting <br />compatible relationships with adjacent properties and the beachfront, encourage and <br />support increased front setbacks of new structures east of Collins Avenue to provide <br />expanded public pedestrian circulation space, reduce building scale impacts and provide <br />for additional buffering and landscape enhancements to assure a high quality <br />environment along the Collins Avenue corridor." The project maintains the large front <br />setbacks from Collins Avenue and reduces building scale impacts with the tower setback <br />211' from the front property line. The project provides significant landscaping within all <br />public areas, including along Collins Avenue and the beach access on the north side yard. <br />Policy 14B of the FLUE establishes the Mixed Use — Resort/ High Density future land use <br />category to, "encourage development and redevelopment within the area east of Collins <br />Avenue for resort style developments catering to tourists and seasonal residents, hotel, <br />apartment hotel, as well as residential apartments. Conference facilities and retail uses <br />such as restaurants, and other convenience services and specialty goods are permitted <br />provided they are accessory to the development." The project proposed 145 residential <br />condominium units with an on -site private restaurant for the residents and their guests. <br />The project is also consistent with the maximum densities and intensities set forth in this <br />policy, with a proposed 5.98 FAR and 72 dwelling units per acre. The project utilizes <br />development bonuses as set forth in the Land Development Regulations and qualifies as <br />a potential receiver site of Transferable Development Rights (TDRs), consistent with <br />Policy 14C. <br />Objective 1 of the Recreation and Open Space Element (ROSE) is to, "Provide for public <br />access to and interaction with the City's beach area." Policy 1 D of the ROSE seeks to <br />provide and maintain public beach access points at % mile (minimum) intervals and Policy <br />1 C encourages oceanfront development designs which preserve view corridors and <br />provide additional public access to the beach. The proposed project has a 20' wide beach <br />access on the north side of the site and an oceanfront park on its east side. <br />V. CONCURRENCY REVIEW <br />The following concurrency review pursuant to Article VI of the City's Land Development <br />Regulations ensures there is adequate facilities to maintain the level of service standards <br />for potable water, sanitary sewer, on -site drainage, solid waste, parks, public schools, <br />and transportation exist or are planned to exist when necessary to serve the development: <br />Page 4 of 18 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.