My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 26-Z-221
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2026
>
Zoning Resolution 26-Z-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2026 3:48:38 PM
Creation date
3/17/2026 12:05:20 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
26-Z-221
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Site Plan Appl (PZ2025-08) MB RE Investments, LLC for "Miami Beach Club" (62) Story Residential Condo Tower w/ 524,212.8 Sq. Ft of FAR.
Reference
Needs to be resigned by Atty
Supplemental fields
Comment
Heard with Companinon Reso No.: 2026-3963; Item 9A.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I I <br />I �Y <br />I <br />1 I <br />J{r <br />it, <br />4 <br />W <br />LOBBY LEVEL " <br />Kimley Horn & Associates, Inc. 07/30/25 Response: Additional details regarding the <br />proposed marked pedestrian crosswalk including pedestrian crossing signage will be <br />provided under separate cover as part of the civil engineering submittals. <br />LSN Law, P.A. 07/30/25 Response: Please see Sheets C-200 and C-201 for pedestrian <br />crossing signage. <br />TCG 08/19/25 Response: Addressed. <br />14. Please add the following projects as approved but unbuilt development projects in the <br />Background Traffic methodology section. Please include the committed trips for these <br />projects as background trips in the traffic impact study. <br />• St. Regis Residences, 18801 Collins Ave <br />• Bentley Residences, 18401 Collins Ave <br />A copy of the traffic impact studies can be obtained from the City of Sunny Isles Beach. <br />Kimley Horn & Associates, Inc. 07/30/25 Response: Comment noted. The above - <br />mentioned committed development projects have been included in the updated <br />methodology. <br />TCG 08/19/25 Response: Addressed. This will be cross-checked as part of the TIS <br />review. <br />TCG 09/26/25 Response: Addressed. The traffic impact study includes the committed <br />trips from the approved but unbuilt development projects in the traffic analysis. <br />® CORRADINO.COM 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.