My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4001
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2026 9:00:08 AM
Creation date
3/30/2026 5:03:27 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4001
Date (mm/dd/yyyy)
03/19/2026
Description
Approving Agreement w/ SHIFF Construction & Development, Inc., for Gateway Pedestrian Bridge Elevator Enclosures Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
authorized to receive and accept any and all communications from the City or the Engineer / <br />Architect. <br />7.7.2. Key administrative, managerial and supervisory personnel assigned by the <br />Contractor to this Project are as follows: <br />Name Function <br />Justen Shiff President <br />The Contractor shall furnish to the City complete resumes of each of the individuals named above. <br />So long as the individuals named above remain actively employed or retained by the Contractor, <br />they shall perform the functions indicated next to their names unless the City agrees to the contrary <br />in writing or unless the City requests the removal of any such individual from the Project. In the <br />event the City requests the removal of any of the individuals named above, the Contractor shall <br />immediately comply and shall immediately replace such individual with a qualified substitute to <br />whom the City makes no objection. In the event one or more individuals not listed above <br />subsequently assumes one or more of those functions listed above, the Contractor shall be bound <br />by the provisions of this Subparagraph 7.7.2 as though such individuals had been listed above. <br />7.8. The Contractor, within fifteen (15) days of commencing the Work, shall submit to <br />the City and the Engineer / Architect for their information, the Contractor's schedule for completing <br />the Work. The Contractor's schedule shall be presented in the critical path (CPM) format. The <br />Contractor's schedule shall be revised no less frequently than monthly (unless the parties otherwise <br />agree in writing) and shall be revised to reflect conditions encountered from time to time and shall <br />be related to the entire Project. Each such revision shall be furnished City and the Engineer / <br />Architect with each Application for Payment. Failure.by the Contractor to strictly comply with the <br />provisions of this Paragraph 7.8 shall constitute a .material breach of this Contract. <br />7.8.1. The Contractor, within (15) days of commencing the Work shall submit to the City <br />and the Engineer / Architect for their information, an anticipated monthly draw schedule for the <br />duration of the Work. If during the course of performing the Work the Contractor anticipates a <br />substantial change in the draw schedule, the Contractor shall notify the City and the Engineer / <br />Architect within three (3) days of anticipating such change. For purposes of this paragraph, a <br />substantial change shall be any increase or decrease equaling or exceeding ten percent (10%) of <br />any anticipated monthly draw. <br />7.9. The Contractor shall continuously maintain at the site, in an orderly fashion and <br />format acceptable to the City, for the benefit of the City and the Engineer / Architect one record <br />copy of this Contract and all Contract Documents marked to record on a current basis changes, <br />selections and modifications made during construction. Additionally, the Contractor shall maintain <br />at the site for the City and Engineer / Architect the approved Shop Drawings, Product Data, Samples <br />and other similar required submittals. Upon final completion of the Work, all of these record <br />documents shall be delivered to the City. <br />Page 16 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.