7.9.1. No less than weekly, the Contractor shall conduct a Project meeting which <br />shall include the Contractor's administrative, managerial and supervisory personnel and <br />representatives of each subcontractor working on the Project site. The meeting shall address, but <br />shall not be limited to, the current status of the Work, including the current Project schedule and <br />the existence of any defective or deficient work as well as the appropriate action required to correct <br />or replace such work. The City and the Engineer / Architect shall have the right, but not the duty, <br />to attend such weekly meetings. The Contractor shall maintain detailed minutes of each such <br />weekly meetings and shall distribute typewritten copies of such minutes to the City and the <br />Engineer / Architect no later than the close of the next workday following completion of such <br />meeting. The Contractor shall further require its General Superintendent to maintain a daily job <br />diary which shall include for each work day the daily weather conditions, the identity of each <br />subcontractor working on the site, the manpower of each subcontractor working on the site, the <br />identity of all visitors to the Project site, documentary progress photographs, and any and all other <br />information reflecting any delays, hindrances, interferences, or other problems encountered or <br />incurred on the Project site. Each week the Contractor shall furnish to the City and the Engineer / <br />Architect on a weekly basis full and complete copies of said daily job diary. <br />7.10 Shop Drawings, Product Data and Samples <br />7.10.1. Shop Drawings, Product Data, Samples and other submittals from the Contractor do <br />not constitute Contract Documents. Their purpose is merely to demonstrate the manner in which <br />the Contractor intends to implement the Work in conformance with information received from the <br />Contract Documents. <br />7.10.2. The Contractor shall not perform any portion of the Work requiring submittal and <br />review of Shop Drawings, Product Data or Samples unless and until such submittals shall have been <br />approved by the Engineer / Architect. Approval by the Engineer /Architect, however, shall not be <br />evidence that Work installed pursuant thereto conforms with the requirements of this Contract. <br />7.10.3. The Contractor shall maintain a log of all Shop Drawings, Product Data and Samples <br />submitted to the Engineer / Architect and the City including, but not limited to, identification of the <br />item of work according to appropriate specification section; date of receipt from appropriate <br />subcontractor or supplier; date of review by the Contractor; date of submission to the Engineer / <br />Architect date of return from the Engineer / Architect date of return to the subcontractor or <br />supplier status of review by the Engineer / Architect and any required re -submittal information. A <br />true and correct copy of this log shall be submitted with each Application for Payment and receipt <br />of same by the Engineer / Architect shall be a condition precedent for approval of the Application <br />for Payment. <br />7.11 Cleaning the Site and the Project <br />7.11.1. The Contractor shall keep the site reasonably clean during performance of the Work, <br />shall remove debris, trash and garbage from the Site daily and allow no accumulation of debris, <br />garbage or trash on the Site. Upon Final Completion of the Work, the Contractor shall clean the site <br />and the Project and remove all waste, together with all of the Contractor's property therefrom. <br />Page 17 of 44 <br />