Laserfiche WebLink
7.12 Access to Work <br />7.12.1. The City, the Engineer / Architect and the Building Department shall have access to <br />the Work at all times from commencement of the Work through Final Completion. The Contractor <br />shall take whatever steps necessary to provide access when requested. <br />7.13 Safety <br />7.13.1. The Contractor shall take all reasonable precautions for safety of, and shall provide <br />reasonable protection to prevent damage, injury or loss to, its employees on the Work and all other <br />persons who may be affected thereby; the Work and materials and equipment to be incorporated <br />therein; and all other property at the site or adjacent thereto including, but not limited to, trees, <br />shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, <br />relocation or replacement in the course of construction. The Contractor shall comply with all <br />applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on <br />safety of persons or property or their protection from damage, injury or loss, and shall give all <br />notices required by same; this requirement includes, but is not limited to, the United States <br />Occupational Safety and Health Act and the Florida Trench Safety Act, Florida Statute S 553.60. <br />7.14 Indemnity <br />7.14.1. To the fullest extent permitted by law, Contractor shall indemnify and hold harmless <br />City, its officers, officials, and employees, from liabilities, damages, losses, and costs, including, but <br />not limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness, <br />omissions, or intentional wrongful conduct of Contractor and persons employed or utilized by <br />Contractor in the performance of this Contract, including but not limited to, subcontractors. This <br />indemnification shall survive the term of this Contract. <br />7.15 Value Engineerine Incentive <br />7.15.1. The City encourages the Contractor to make timely value engineering and cost <br />savings recommendations. In the event the City approves by duly executed change order any value <br />engineering or cost savings recommendation of the Contractor, and in the further event the <br />Contract Sum is reduced thereby, any savings shall be shared with Seventy -Five Percent (75%) being <br />allocated City and Twenty -Five Percent (25%) being allocated to the Contractor. It is agreed, <br />however, that the Contractor shall procure and obtain at its sole cost and expense all change orders, <br />drawings, specifications, permits, approvals, or other documents required in order to implement <br />the value engineering or cost savings recommdation. ANY CLAIM UNDER THIS PARAGRAPH MUST <br />BE SUBMITTED IN WRITING TO THE CITY AND THE ENGINEER / ARCHITECT PRIOR TO THE <br />EXECUTION OF THE CHANGE ORDER INCORPORATING THE CONTRACTOR'S RECOMMENDATION <br />OTHERWISE SAID CLAIM IS EXPRESSLY WAIVED. Any savings allocated to the Contractor under this <br />Paragraph shall be paid at the time of Final Payment to the Contractor. <br />7.16 Miscellaneous <br />7.16.1. Prior to commencement of the Work, the Contractor shall submit to the City a plan <br />for site access and control of construction traffic. Said plan shall include, but not be limited to, an <br />Page 18 of 44 <br />