My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4001
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2026 9:00:08 AM
Creation date
3/30/2026 5:03:27 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4001
Date (mm/dd/yyyy)
03/19/2026
Description
Approving Agreement w/ SHIFF Construction & Development, Inc., for Gateway Pedestrian Bridge Elevator Enclosures Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
enumeration of each construction access point to the site and a description of how access will be <br />controlled and regulated; a description of any impact that construction traffic may have on the <br />public streets and highways, and the Contractor's plan for minimizing and reducing such impact; <br />and, the name and address of the individual employed by the Contractor who shall have <br />responsibility for control and management of construction traffic. Approval by the City of this plan <br />is a condition precedent to payment of any sums to the Contractor. The Contractor furthermore <br />agrees to cooperate with the City and all other appropriate governmental entities with respect to <br />the control, regulation, scheduling and management of construction traffic. <br />7.16.2. The Contractor shall be responsible for, and shall pay the cost of, all temporary <br />facilities used, or made available, during the course of the Work. These facilities include, but shall <br />not be limited to, electric power, gas, water, sewage and sanitation, waste removal and disposal, <br />telephone, and temporary office facilities. The Contractor shall timely pay for all such temporary <br />facilities and shall coordinate the installation and removal of such facilities including, but not limited <br />to, any required coordination with any utility company. Furthermore, the Contractor shall be <br />responsible for, and shall pay the cost of, any utility work which may be necessary in order to <br />perform the Work required by the Contract Documents; this responsibility includes, but is not <br />limited to, the cost of installing, moving, or relocating electric, water, sewer, gas, or other utility <br />lines, wires, poles, pipe, and any other equipment of every kind and nature. <br />7.16.3. After first giving at least seventy-two (72) hours written notice to the City and the <br />Engineer / Architect, the Contractor shall conduct any and all testing required under the Contract <br />Documents and report the results of same to the City and the Engineer / Architect within twenty- <br />four (24) hours of receipt unless the City or the Engineer / Architect instructs otherwise. The <br />Contractor shall also cooperate with the City and the Engineer / Architect in the event the City or <br />the Engineer / Architect elects to conduct testing for any purpose. The Contractor shall make the <br />site, or any relevant portion thereof, available for such testing by the City or the Engineer/ Architect <br />and the Contractor shall so schedule and coordinate its work so as not to interfere with any testing <br />by the City or the Engineer / Architect. When requested by the City or the Engineer / Architect the <br />Contractor shall furthermore uncover Work and otherwise assist in testing as may be required by <br />the City or the Engineer / Architect. The services requested by the City which are required to be <br />provided by an Independent Testing Laboratory shall be paid by the City unless otherwise stated in <br />the Contract Documents. Contractor may not rely upon any testing performed by the City or the <br />Engineer / Architect but shall remain solely responsible for insuring compliance with all Contract <br />Documents and testing requirements. The Contractor shall be responsible for the payment of any <br />of its testing. <br />ARTICLE Vlll <br />CONTRACT ADMINISTRATION <br />8.1 The Engineer / Architect <br />8.1.1. The Engineer / Architect for this project is Rodriguez Architects, Inc., c/o David M. <br />Shewairy, Assoc. AIA, FCP; (786) 650-5655. In the event the City should find it necessary or <br />convenient to replace the Engineer / Architect the City shall retain a replacement Engineer / <br />Page 19 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.