My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4001
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2026 9:00:08 AM
Creation date
3/30/2026 5:03:27 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4001
Date (mm/dd/yyyy)
03/19/2026
Description
Approving Agreement w/ SHIFF Construction & Development, Inc., for Gateway Pedestrian Bridge Elevator Enclosures Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architect and the status of the replacement Engineer / Architect shall be that of the former <br />Engineer / Architect. <br />8.2 Engineer / Architect's Administration <br />8.2.1. The Engineer / Architect, unless otherwise directed by the City in writing, will <br />perform those duties and discharge those responsibilities allocated to the Engineer / Architect as <br />set forth in this Contract. The Engineer / Architect shall be the City's representative from the <br />effective date of this Contract until final payment has been made. The Engineer / Architect shall be <br />authorized to act on behalf of the City only to the extent provided in this Contract. <br />8.2.2. The City and the Contractor shall communicate with each other in the first instance <br />through the Engineer / Architect. The Contractor and the Engineer / Architect, however, shall copy <br />the City's designated representative with any and all written communications by and between the <br />parties. The City's designated representative for the receipt of any such communications, or copies <br />of same, is Fabricio Volpi, whose address is City of Sunny Isles Beach,18070 Collins Avenue, Sunny <br />Isles Beach FL 33160; fvolpi@sibfl.net; (305) 792-1930. The City reserves the right to change its <br />designated representative upon written notice to the Contractor and Engineer / Architect. <br />8.2.3. The Engineer / Architect shall be the initial interpreter of the requirements of the <br />drawings and specifications and the judge of the performance there under by the Contractor. The <br />Engineer / Architect shall render written or graphic interpretations necessary for the proper <br />execution or progress of the Work with reasonable promptness on request of the Contractor. <br />8.2.4. The Engineer / Architect will review the Contractor's Invoice and will certify to the <br />City for payment to the Contractor, those amounts then due the Contractor as provided in this <br />Contract. <br />8.2.5. The Engineer / Architect shall have authority to reject Work which is defective or <br />does not conform to the requirements of this Contract. If the Engineer / Architect deems it <br />necessary or advisable, the Engineer / Architect shall have authority to require additional <br />inspection or testing of the Work for compliance with Contract requirements. <br />8.2.6. The Engineer / Architect will review and approve, or take other appropriate action <br />as necessary, concerning the Contractor's submittals including Shop Drawings, Product Data and <br />Samples. Such review, approval or other action shall be for the sole purpose of determining <br />conformance with the design concept and information given through the Contract Documents. <br />8.2.7. The Engineer / Architect will prepare Change Orders and may authorize minor <br />changes in the Work upon approval from the City by Field Order as provided elsewhere herein. <br />8.2.8. The Engineer / Architect shall, upon written request from the Contractor, conduct <br />inspections to determine the date of Substantial Completion and the date of Final Completion, will <br />receive and forward to the City for the City's review and records, written warranties and related <br />documents required by this Contract and will issue a final Certificate for Payment upon compliance <br />with the requirements of this Contract. <br />Page 20 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.