My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4003
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 10:49:37 AM
Creation date
4/7/2026 1:54:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4003
Date (mm/dd/yyyy)
03/19/2026
Description
1st Amnd to Agreement w/ MBR Construction, Inc., to provide addt'l time for final completion of construction services for the Intracoastal Sports Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />issued deducting from the Contract Price the cost of correcting the subject deficiencies, plus <br />compensation for the Engineer / Architect's additional services and expenses necessitated thereby, if <br />any. If the unpaid portion of the Contract Price is insufficient to cover the amount due the City, the <br />Contractor shall pay the difference to the City. <br />6.4 Inspections <br />6.4.1. No inspector shaft have authority to waive any requirements of the Contract <br />Documents. Any failure or omission on the part of any inspector, the Engineer / Architect or any <br />agent of the City, to condemn any defective work or material shall not release the Contractor from <br />its obligations to install the Work free from faults and defects and to promptly remove and repair <br />any defective or deficient work. The Contractor hereby acknowledges and agrees that no inspector <br />shall have authority to: <br />(a) Authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment; <br />(b) Undertake any of the responsibilities of the Contractor, subcontractors or <br />Contractor's superintendent; <br />(c) Expedite the Work for the Contractor; <br />(d) Advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is specifically <br />called for in the Contract Documents; <br />(e) Advise on or issue directions as to safety precautions and programs in <br />connection with the Work. Provided however, this shall not preclude the City <br />inspector from notifying the Contractor of any hazardous or dangerous <br />condition; <br />(f) Participate in specialized field or laboratory tests. <br />6.5 Not Applicable and Omitted <br />6.6 Coordination and Scheduling of Work <br />6.6.1. The Contractor shall cooperate with the City and any separate contractors retained by <br />the City, and the Contractor shall carefully coordinate and schedule the Work as may be required to <br />accommodate without delay or interference the Work of the City or any of its separate contractors. <br />6.7 Contractor Responsible for Delays <br />6.7.1. The Contractor shall be responsible for any damages caused to the City as a result of <br />any delays caused by the Contractor. <br />MBR CONSTRUCTION, INC. Page 12 of 41 <br />1R1 <br />331 <br />
The URL can be used to link to this page
Your browser does not support the video tag.