My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4003
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 10:49:37 AM
Creation date
4/7/2026 1:54:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4003
Date (mm/dd/yyyy)
03/19/2026
Description
1st Amnd to Agreement w/ MBR Construction, Inc., to provide addt'l time for final completion of construction services for the Intracoastal Sports Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.8 City'sght to Occupy <br />6.8.1. The City reserves the right to occupy any part of the Project when same is <br />Substantially Complete. It is expressly agreed, however, that partial occupancy of any part of the <br />Project does not activate any warranty obligations of the Contractor and any warranties which <br />contain time limitations shall commence on the date of Final Completion unless otherwise expressly <br />specified in the Contract Documents. <br />ARTICLE VII <br />THE CONTRACTOR <br />7.1. Upon providing no less than forty-eight (48) hours' notice to the Contractor, the City <br />may conduct a pre -construction conference at a time and place set forth in the aforesaid notice. <br />ATTENDANCE AT ALL PRE -CONSTRUCTION CONFERENCE(S) IS MANDATORY AND <br />FAILURE TO ATTEND SHALL BE A MATERIAL BREACH OF THIS CONTRACT. <br />7.2. The Contractor is again reminded of its continuing duty set forth in Subparagraph <br />1.5.7. The Contractor shall perform no part of the Work at any time without adequate Contract <br />Documents or, as appropriate, approved Shop Drawings, Product Data or Samples for such portion <br />of the Work. If the Contractor performs any of the Work knowing it involves a recognized error, <br />inconsistency, or omission in the Contract Documents without such notice to the Engineer / Architect <br />the Contractor shall bear responsibility for such performance and shall bear the cost of correction. <br />7.3. The Contractor shall perform the Work strictly in accordance with this Contract. The <br />Contractor shall also be responsible for all cutting, fitting or patching that may be required to <br />complete the Work or to make its several parts fit together properly. <br />7.4 Contractor's Professional Standard <br />7.4.1. City's engagement of the Contractor is based upon the Contractor's representations <br />to the City that: <br />(a) Contractor has carefully reviewed all Construction Documents prior to <br />signing this Contract. <br />(b) Contractor is an organization experienced in, and qualified, willing and able <br />to provide construction of the nature and type necessary to perform the Work; <br />(c) Contractor is authorized and licensed to do business in the State of Florida, <br />Miami -Dade County and the City of Sunny Isles Beach; and <br />(d) Contractor shall furnish labor, material, equipment and services (i) which <br />expeditiously, economically and properly complete the Work in the manner <br />most consistent with the City's interests and objectives, (ii) in accordance with <br />the Construction Documents, and (iii) in accordance with the highest <br />standards currently practiced by persons and entities performing comparable <br />MBR CONSTRUCTION, INC. Page 13 of 41 <br />162 <br />332 <br />
The URL can be used to link to this page
Your browser does not support the video tag.