My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4003
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 10:49:37 AM
Creation date
4/7/2026 1:54:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4003
Date (mm/dd/yyyy)
03/19/2026
Description
1st Amnd to Agreement w/ MBR Construction, Inc., to provide addt'l time for final completion of construction services for the Intracoastal Sports Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor submitted pricing for City initiated proposal requests. This review time is only for <br />correctly submitting pricing. Submitted pricing found not to be in correct format, or containing <br />pricing that relates to Work clearly not part of the change, or contains Subcontractor pricing not in <br />the correct format, or contains Sub -Contractor pricing that relates to Work clearly not part of the <br />change, will not be reviewed and returned to the Contractor for proper submission and as such, no <br />Contractor claims for delay will be accepted as a result of extended response time due to improper <br />pricing submission. <br />10.3.2.6. The Engineer / Architect will review properly submitted Contractor pricing and <br />compare submitted pricing with published pricing data contained in the Building Cost Data, <br />Mechanical Cost Data and Electrical Cost Data, latest edition, as published by R.S. Means <br />Company, Inc. Contractor submitted pricing found to be in excess of five (5%) percent above the <br />stated published pricing will not be accepted and as such, no Contractor claims for delay will be <br />accepted as a result of extended response time due to excessive pricing submittal by the Contractor. <br />10.3.3. The value of any change ordered under the Contract for extra work or any reductions <br />in work required, shall be determined under one or more of the following procedures before a <br />written change order is issued. <br />10.3.3.1. By Unit Price named in the contract or subsequently agreed upon by the City and the <br />Contractor, which prices shall include Contractor's overhead and profit. <br />10.3.3.2. By Lump Sum Price agreed upon by the City and, the Contractors which pricc .shall <br />include overhead and profit. A breakdown of the estimated costs comprising the lump sum price <br />may be required by the Engineer / Architect for review. Percentage for overhead and profit shall be <br />determined in accordance with the method listed described under Overhead and Profit below. <br />10.3.3.3. By a Cost Plus Price on total actual costs, plus an added percentage, all determined <br />as described under Overhead and Profit below. <br />10.3.3.4 Overhead and Profit <br />(a) Subcontractor's overhead, including supervision and the furnishing, use and <br />maintenance of small tools and ordinary equipment incidental to and required <br />for the Work shall be just and fully compensated for by adding an amount <br />equal to FIVE PERCENT (51/6) of the sum of material and labor costs as <br />defined under Subcontractor's profit below, but excluding equipment rental <br />costs. <br />(b) Subcontractor's profit may then be added to the above material costs and <br />labor costs including the Overhead allowance at the rate of SEVEN <br />PERCENT (71/6) of the sum of those costs, excluding equipment rental costs. <br />(c) Contractor's overhead, including general supervision and the furnishing, use <br />and maintenance of small tools incidental to and required for the Work <br />accomplished by its own direct labor shall be considered to be just and fully <br />compensated for by adding an amount equal to FIVE PERCENT (5%) of the <br />MBR CONSTRUCTION, INC. Page 23 of 41 <br />172 <br />342 <br />
The URL can be used to link to this page
Your browser does not support the video tag.