My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4003
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 10:49:37 AM
Creation date
4/7/2026 1:54:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4003
Date (mm/dd/yyyy)
03/19/2026
Description
1st Amnd to Agreement w/ MBR Construction, Inc., to provide addt'l time for final completion of construction services for the Intracoastal Sports Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sum of material and labor costs as defined under Material costs and Labor <br />costs below, but excluding equipment rental costs and bond allowance. <br />(d) Contractor's overhead, including general supervision and the furnishing, use <br />and maintenance of small tools and equipment incidental to and required for <br />the Work accomplished by subcontractors shall be considered to be just and <br />fully compensated for by adding an amount equal to FIVE PERCENT (5%) <br />of the sum of material and labor costs as defined under Material costs and <br />Labor costs below, but excluding equipment rental costs and bond allowance. <br />(e) Contractor's profit may then be added into the above material costs and labor <br />costs, including the Overhead allowance at the rate of SEVEN PERCENT <br />(71/6) of the sum of those costs, excluding equipment rental costs. <br />10.3.3.5. Bond Allowance: For maintaining the Public Construction Bond at 100% of the <br />Contract Price, a sum of ONE PERCENT (1%) of the total cost of the change (including material, <br />labor, overhead and profit, and equipment rental) shall be allowed on all change orders. <br />10.3.3.6. Material costs actually recorded by the Contractor and the subcontractor as materials <br />are delivered to the site and, as evidenced from originally receipted invoices, listing appropriate <br />quantities and unit prices. Records in proper form shall be maintained and made available to the <br />Engineer / Architect and the City at all times. <br />10.3.3.7. Labor Costs represented by the actual wages paid to all laborers, apprentices, <br />journeymen, and foremen involved in and necessary to completing the particular construction <br />operations, for each day and every hour such labor teams and foremen are actually employed on the <br />extra work required, including the net cost of insurance, social security and Workmen's <br />Compensation. Records in proper form shall be maintained and be made available to the Engineer / <br />Architect and the City at all times. <br />10.3.3.8. Rentals for special equipment or machinery such as power driven roller, tractors, <br />trucks, shovels, drills, mixers, pumps, hoists, etc. required for the economical performance of the <br />work at reasonable rental prices agreed upon before work commences, shall be allowed the <br />Contractor and subcontractors by the Engineer / Architect and the City for each and every hour such <br />special equipment is in use on the particular work. To the sum of such equipment rentals, no <br />additional percentage shall be added. <br />10.3.3.9. Owned Equipment for certain owned heavy or specialized equipment (defined as <br />tools and equipment with an individual purchase cost of more than One Thousand Dollars ($1000)) <br />brought on to the job site specifically for change order work shall be valued at 75 percent of the <br />monthly rental divided by 176 to arrive at a maximum hourly rate to be applied to the hours the <br />equipment is used performing the change order work. Fuel and an operator necessary to utilize the <br />equipment will be considered as a separate direct cost associated with the change order work. No <br />recovery will be allowed for heavy or specialized equipment that is already on the jobsite and is <br />necessary to complete work of the original contract. No recovery will be allowed for hand tools, <br />power tools, minor equipment, work vehicles (including pickup trucks and cargo vans), simple <br />scaffolds, etc. The longest period of time that the equipment is to be required for the work will be <br />the basis for pricing. Downtime due to repairs, maintenance and weather delays will not be allowed. <br />MBR CONSTRUCTION, INC. Page 24 of 41 <br />173 <br />343 <br />
The URL can be used to link to this page
Your browser does not support the video tag.