My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ # 26-07-01 CONTINUING ARCHITECTURAL AND ENGINEERING SERVICES (2)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
RFQ # 26-07-01 CONTINUING ARCHITECTURAL AND ENGINEERING SERVICES (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:16:42 PM
Creation date
8/31/2026 12:16:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br /> Page 28 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />Documents consisting of working drawings and specifications setting forth in detail the work <br />required for the architectural, civil, transportation, structural, mechanical, electrical, site, and <br />other work, and the necessary bidding information, general conditions, supplementary conditions <br />and proposal forms. The Consultant shall submit to the City ten copies of the Construction <br />Documents, and a further revised Estimate of Total Construction Cost. <br /> <br />Prior to final approval of the Construction Documents by the CITY, the Consultant shall conduct a <br />preliminary check of any Work products to insure compliance with requirements of any County, <br />City, State, or Federal agency from which a permit or other approval is required. Consultant shall <br />prepare all support documents to accompany any necessary permit applications. Consultant shall <br />respond to all technical questions from regulatory agencies. The Consultant shall modify at no <br />additional cost to the CITY, Construction Documents in order to acquire the necessary permits. <br /> <br />The Consultant shall signify their responsibility for the Construction Documents prepared <br />pursuant to this award by affixing his signature, date and seal thereto as required by Chapters 471 <br />and 481, Florida Statutes. If requested, Consultant shall review and analyze the bids received by <br />the CITY, and shall make a recommendation for award based on the CITY'S Purchasing Ordinance. <br /> <br />Should any component of the design or report not meet applicable regulations or codes in effect <br />at the time of completion of design, the Consultant shall redesign with no additional cost to the <br />City. <br /> <br />Consultant shall provide to the City, at no additional cost the specifications on a disc or flash drive, <br />and drawings and as-built on the latest version of AutoCAD or other media as required by the City. <br />CONSULTANT'S services under the construction Document Phase will be considered partially <br />complete when the bid documents are delivered to and accepted by the City, and finally complete <br />when the CADD drawings are accepted by the City’s Project Manager. <br /> <br />PHASE 4: PERMITTING, BIDDING, & NEGOTIATION <br /> <br />The Consultant shall attend all pre-bid conferences, prepare and distribute minutes. The <br />Consultant shall issue Addenda through the City’s Purchasing Administrator as appropriate to <br />clarify, correct, or change Bid Documents. <br /> <br />If Pre-Qualification of bidders is required as set forth in the Invitation to Bid, Consultant shall assist <br />City in developing qualification criteria, review qualifications of prospective bidders, and <br />recommend acceptance or rejection of the prospective bidders. <br /> <br />If requested, Consultant shall evaluate bids and bidders, and recommend award to the City. For <br />the purpose of payment to the Consultant, the Bidding Phase will terminate and the services of <br />the Consultant will be considered complete upon signing of a Contract with a Consultant, or <br />cancellation of the project by the City prior to signing of Contract with a Consultant. Rejection of <br />bids by the City does not constitute cancellation of the project. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.