Laserfiche WebLink
The B.F. James Park and Aquatic Facility project encompassed the complete <br />redevelopment of an underused, existing neighborhood park through public <br />input and master plan development. From the ongoing neighborhood <br />involvement and working closely with city staff, the BA team developed <br />an extensive program for the new park including a new community <br />swimming facility, reconfigured professional level basketball courts, picnic <br />areas, exercise stations, and an expanded shaded playground area that <br />accommodates a greater range of age groups. <br />As both the project landscape architect and project architect, BA developed <br />various alternatives for the aquatic swim building, a focal point to the park’s <br />redevelopment. The new pool serves the community’s recreational needs, <br />including a beach entry feature and three lap lanes which can be modified <br />for swim health classes. Designed to both improve community access and <br />allow for better visibility into the park, a new parking lot was designed along <br />the park’s south side. <br />B.F. JAMES PARK <br />Hallandale Beach, Florida <br />CLIENT <br />City of Hallandale Beach <br />SIZE <br />2.7 acres <br />COST <br />$5 million <br />COMPLETION <br />2015 <br />SCOPE OF SERVICES <br />Master Planning, Architecture, Landscape <br />Architecture, and Construction Administration <br />19 | CiTY OF SUNNY iSLES BEACH | RFQ #26-07-01 CONTiNUiNG PROFESSiONAL ARCHiTECTURAL AND ENGiNEERiNG CONSULTiNG SERViCES (CCNA)