My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & Partners, LLC Bid Document (28)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Bermello Ajamil & Partners, LLC
>
Bermello Ajamil & Partners, LLC Bid Document (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:19:34 PM
Creation date
8/31/2026 12:17:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The B.F. James Park and Aquatic Facility project encompassed the complete <br />redevelopment of an underused, existing neighborhood park through public <br />input and master plan development. From the ongoing neighborhood <br />involvement and working closely with city staff, the BA team developed <br />an extensive program for the new park including a new community <br />swimming facility, reconfigured professional level basketball courts, picnic <br />areas, exercise stations, and an expanded shaded playground area that <br />accommodates a greater range of age groups. <br />As both the project landscape architect and project architect, BA developed <br />various alternatives for the aquatic swim building, a focal point to the park’s <br />redevelopment. The new pool serves the community’s recreational needs, <br />including a beach entry feature and three lap lanes which can be modified <br />for swim health classes. Designed to both improve community access and <br />allow for better visibility into the park, a new parking lot was designed along <br />the park’s south side. <br />B.F. JAMES PARK <br />Hallandale Beach, Florida <br />CLIENT <br />City of Hallandale Beach <br />SIZE <br />2.7 acres <br />COST <br />$5 million <br />COMPLETION <br />2015 <br />SCOPE OF SERVICES <br />Master Planning, Architecture, Landscape <br />Architecture, and Construction Administration <br />19 | CiTY OF SUNNY iSLES BEACH | RFQ #26-07-01 CONTiNUiNG PROFESSiONAL ARCHiTECTURAL AND ENGiNEERiNG CONSULTiNG SERViCES (CCNA)
The URL can be used to link to this page
Your browser does not support the video tag.