My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BetaJones Group, Inc., The Bid Document (38)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
BetaJones Group, Inc., The
>
BetaJones Group, Inc., The Bid Document (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:28:38 PM
Creation date
8/31/2026 12:27:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal Requirements <br />Resumes - ProCon Engineering Inc. <br />Fernando Anzoategui, General Mechanical & General Electrical <br />Engineer <br />[Principal & MEP Engineer] <br />Years of Experience: 35 / Years with the Firm: 20 <br />EDUCATION: <br /> MBA Finance, Indiana University, <br />1980 <br /> BS Mechanical Engineering, Purdue <br />University, 1976 <br /> <br />LICENSING & REGISTRATIONS: <br />Professional Engineer <br />FL– #36032 <br />PROFESSIONAL AFFILIATIONS: <br />NFPA, LEED, ASHRAE <br />Mr. Anzoategui's technical expertise includes specialization in HVAC, Electrical, fire alarm, plumbing, fire protection, <br />and computerized energy analysis. He has provided mechanical and electrical consulting engineering services to a <br />broad range of clients and has completed projects for commercial, institutional, and light industrial projects. During <br />his tenure as Chief Mechanical Engineer for an architectural/engineering firm in Florida, Mr. Anzoategui was <br />responsible for the design of building mechanical systems, including HVAC, plumbing, fire protection and diesel- <br />electric generating plant systems. He was additionally responsible for planning and development of the engineering <br />for such projects, performing computerized energy and economic analysis of new and existing large buildings with <br />TRACE 700 and evaluating and adjusting manpower requirements and construction supervision. <br /> <br /> <br />Experience <br />Role on Select Projects Below: Mechanical, Electrical, Plumbing, Fire Sprinkler Design and Consulting Engineer <br /> <br />Hollywood Hills Senior High Major Alterations Phase 2 l Hollywood, FL <br />Mechanical/Electrical/Plumbing/Fire Sprinkler Engineering Design as follows to upgrade Main Buildings AHU’s, Fire Sprinklers, <br />Chillers, New FA & EMS as well as Major Electrical & Mechanical System upgrades throughout the school. Remodeling of Group <br />Restrooms and upgrade for ADA compliance. <br />Design Completion Date: December 2018 <br />Construction Completion Date: August 2022 <br /> <br />Twin Lakes Elementary School Deferred Maintenance Project l Miami, FL <br /> Replacement of HVAC systems and Exterior windows in six (6) buildings, complete renovations of two (2) group restrooms to m eet <br />ADA requirements, addition of missing lighted exit signs, playground remodeling and completely new HVAC system in Building 5 <br />(Administration Building) including ductwork and exhaust fan. Three new electric panels, feeders and branch circuits were adde d as <br />required to power new ac units and new exhaust fans for Group Restrooms. <br />Design Completion Date: November 2014 <br />Construction Completion Date: February 2015 <br /> <br />MDCPS Lillie C Evans K-8 Center GOB Deferred Maintenance Project l Miami, FL <br />- Performed Mechanical, Electrical and Plumbing engineering and design and managed/supervised Architect, Str uctural and Civil <br />engineering for the addition of air conditioning system (20 tons) to existing Kitchen, covered walkway between two (2) existing <br />buildings, passenger elevator and backflow preventer in main domestic water pipe. Roof replacement of two (2) buildings. <br />- Remodeling of four (4) Group Restrooms and twelve (12) individual classroom toilet rooms and make them ADA compliant. <br /> Design Completion Date: November 2018 <br />Construction Completion Date: September 2020 <br /> <br />At&t Ojus CO 2nd Floor Remodeling Project l Miami, FL <br />- Performed Mechanical, Electrical and Plumbing engineering /design and consulting services for the remodeling of the south half of the <br />2nd floor to accommodate a new training center. Remodeling included expansion of Women’s and Men’s Restrooms and upgrade for <br />ADA compliance. <br />- Design Completion Date: January 2020 <br />Construction Completion Date: March 2022 <br /> <br />At&t Hollywood Main Office 3rd Floor West Side Remodeling Project l Hollywood, FL <br />- Performed Mechanical, Electrical and Plumbing engineering/design and consulting services for the remodeling of the west side of the <br />3rd floor to accommodate personnel move to this building. Remodeling included renovations of Women’s and Men’s Restrooms and <br />upgrade for ADA compliance. <br />- Design Completion Date: September 2019 <br />Construction Completion Date: July 2021 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />50 The BetaJones Group/RFQ#26-07-01
The URL can be used to link to this page
Your browser does not support the video tag.