My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.A.P. Engineering, Inc. Bid Document (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
C.A.P. Engineering, Inc
>
C.A.P. Engineering, Inc. Bid Document (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:36:32 PM
Creation date
8/31/2026 12:35:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 26-07-01 <br />City of Sunny Isles Beach <br />Client <br />Carlos A. Penin, PE <br />Principal <br />Joshua E. Midence, PE <br />CEI Project Manager <br />Carlos Vazquez, PE <br />Mechanical / HVAC / <br />Plumbing <br />Project Manager <br />Abel Carrasco, PE, SI <br />Structural <br />Project Manager <br />Mohan Thampi <br />PE, REM, CFM <br />Civil & Transportation <br />Project Manager <br />3.2 - Organizational Chart <br />Q: How will CAP's proposed personnel and subconsultants be organized to <br />manage, coordinate, and deliver services to the City?RFQ No. 26-07-01 <br />C.A.P. Engineering, Inc. <br />100 100 <br />75 75 <br />75 <br />Thomas Cuesta, EI <br />Civil / Structural / <br />Roadway <br />Rolando Alvarez, EI <br />Civil / Structural / Roadway <br />Ernesto Cruz, PE <br />Electrical Engineer <br />Felipe de la Cruz, PE <br />Civil / Structural / Roadway <br />Alejandro de Alba <br />Mechanical / Electrical <br />Anaily Carbonell, EI <br />Civil / Structural <br />Roy Vinas, EI <br />Civil / Structural <br />23
The URL can be used to link to this page
Your browser does not support the video tag.