Laserfiche WebLink
<br /> <br />790 NW 107 Avenue, Suite 200, Miami, FL 33172. Submitted August 2026 Page 13 <br />RFQ RESPONSE – City of Sunny Isles Beach <br />RFQ # 26-07-01 | CONTINUING PROFESSIONAL ARCHITECTURAL & <br />ENGINEERING CONSULTING SERVICES (CCNA) <br />Service Description <br />Traffic Impact Studies and <br />Development Review <br />Preparation and peer review of traffic impact studies, trip generation and distribution, <br />site-access analysis, concurrency review, development mitigation, circulation review, <br />and coordination with applicants and reviewing agencies. <br />Intersection Control <br />Evaluations <br />Signal warrants, all-way stop warrants, roundabout feasibility and capacity analysis, <br />intersection control evaluations, pedestrian-control evaluations, and conceptual <br />improvement design. <br />Traffic Signal Design, <br />Timing, and Optimization <br />Signal timing plans, coordination plans, retiming, corridor progression, adaptive signal- <br />control evaluation, signal design, controller and cabinet evaluations, field <br />implementation support, and post-implementation monitoring. <br />Intelligent Transportation <br />Systems <br />ITS planning and design, traffic-management-system integration, detection and <br />communications evaluations, performance monitoring, automated traffic signal <br />performance measures, and technology-based operational improvements. <br />Traffic-Calming and Speed <br />Management <br />Speed studies, neighborhood traffic analysis, traffic-calming master planning, and <br />conceptual or final design of speed humps, raised intersections, curb extensions, <br />roundabouts, signing, pavement markings, and related countermeasures. <br />Vision Zero and Roadway <br />Safety <br />Roadway safety action plans, high-injury-network analysis, crash analysis, Intersection <br />Control Evaluation methodology, road safety audits, systemic safety analysis, <br />countermeasure evaluation, crash-reduction analysis, and implementation <br />prioritization. <br />Signing, Pavement Marking, <br />and Roadway Lighting <br />Signing and pavement-marking plans, wayfinding plans, roadway-lighting evaluations <br />and design, photometric analysis, field inventories, ADA/PROWAG review, cost <br />estimates, and construction support. <br />Maintenance of Traffic and <br />Work-Zone Safety <br />MOT plan preparation and review, temporary traffic-control plans, construction staging, <br />pedestrian and bicycle accommodation, work-zone safety assessments, and special- <br />event traffic-management plans. <br />Transportation Data <br />Collection and Analytics <br />Turning-movement counts, traffic-volume and classification counts, pedestrian and <br />bicycle counts, speed studies, travel-time studies, parking surveys, origin-destination <br />studies, license-plate studies, field inventories, GIS analysis, and applicable big-data <br />sources. <br /> <br />