|
<br />
<br />790 NW 107 Avenue, Suite 200, Miami, FL 33172. Submitted August 2026 Page 21
<br />RFQ RESPONSE – City of Sunny Isles Beach
<br />RFQ # 26-07-01 | CONTINUING PROFESSIONAL ARCHITECTURAL &
<br />ENGINEERING CONSULTING SERVICES (CCNA)
<br />3.STAFFING
<br />3.1.Key Personnel
<br />CALTRAN assigns dedicated senior-level staff based at the Miami office to this contract, ensuring
<br />continuity and responsiveness throughout the five-year term. Complete resumes are provided in
<br />Attachment A.
<br />Key Staff Summaries
<br />Name / Credentials Project Role Years Exp. Avail.
<br />Juan Calderon, PE, PTOE, RSP1 Project Manager / Principal-in-Charge 29 90%
<br />Jeannelia Liu, PE QA/QC Manager 30 65%
<br />Carlos M. Perez, PE Traffic Data Collection Manager 26 75%
<br />Nelson Galeano PE, PTOE, PTP, RSP1 Traffic Safety Professional /
<br />Transportation Planner
<br />25 75%
<br />Alvaro Saenz Sheen, PE, PTOE, RSP1 Traffic Engineer Lead 9 75%
<br />Stevan Gonzalez PE Transportation Planner Lead 11 75%
<br />Juan Pablo Romero, EI, IMSA2 Traffic Engineer 14 70%
<br />Carlos Borges Signalization & Pavement Markings
<br />Review/Lighting
<br />29 65%
<br />Smiley Urena, PE Roadway Engineer 9 70%
<br />Eliciel Gonzalez, EI Roadway Engineer 7 75%
<br />Patricia Valencia PE, CGC Senior CEI Engineer/Constructability 25 60%
<br />Juan Calderon, PE, PTOE, PTP, RSP1 | Project Manager
<br />Mr. Calderon brings over 29 years of traffic and transportation engineering
<br />experience, with a Master’s Degree in Civil Engineering from Florida International
<br />University. As CALTRAN’s Project Manager, he has led numerous projects for the City
<br />of Miami Beach, FDOT District Six, Miami-Dade County, and other South Florida
<br />municipalities. His work has included traffic impact studies, multimodal planning, traffic calming, safety
<br />analyses, and roadway design—always with a focus on balancing mobility, safety, and resiliency. Mr.
<br />Calderon has served as Engineer of Record (EOR) on resurfacing, widening, signalization, and
<br />multimodal corridor projects, applying FDOT and Complete Streets standards to deliver context-
<br />sensitive solutions that align with the City’s unique needs as a barrier island community.
<br />Mr. Calderon is highly familiar with the City’s transportation challenges, having supported projects
<br />involving traffic operations, micro-simulation validation, crash reduction strategies, valet and rideshare
<br />evaluations, and multimodal access improvements. His expertise extends to advanced modeling, GIS
<br />mapping, and innovative safety measures such as pedestrian hybrid beacons and raised intersections.
<br />As Project Manager, Mr. Calderon will serve as the City’s primary point of contact, ensuring responsive
<br />communication, onsite support, and proactive problem-solving. His leadership and deep knowledge
<br />of Sunny Isle Beach’s mobility context make him exceptionally qualified to guide the City’s continuing
<br />traffic engineering services.
|