|
ELICIEL GONZALEZ, EI
<br />DESIGNER
<br />PROFILE
<br />Mr. Gonzalez has over 8 years of experience in the design and coordination of the engineering
<br />aspects of Roadway Design. His experience includes signalization design, geometric design,
<br />roadway planproduction, quantification and computation of pay items, temporary traffic control
<br />designs, and signing and pavement markings applying FDOT design standards and criteria.
<br />KEY PROJECTS
<br />CITY OF CAPE CORAL | Cape Coral PKWY 6-Laning |2023-2026 | RRR project to convert
<br />side street parking into through lanes for each direction, converting a 4-lane corridor to a 6-
<br />lane corridor. In addition, preserve and extend the life of the roadway by milling and resurfacing
<br />existing pavement. Activities included repaving and restriping the roadway, median widening,
<br />signalization, signing and pavement markings, ADA Compliance, crosswalks, and curb & gutter
<br />replacements. Responsible for roadway design, signing and pavement markings, plan
<br />preparation, Specs and Quantities. Contact: Wendy Williams, wwilliam@capecoral.gov
<br />FDOT D6 | SW 7th Street from SW 8th St to Biscayne Blvd | 2022-Ongoing | RRR project
<br />to preserve and extend the life of the roadway by milling and resurfacing existing pavement.
<br />Activities included repaving and restriping the roadway, installing curb ramps, signalization,
<br />signing and pavement markings, ADA Compliance, and crosswalks. Responsible for roadway
<br />design, modeling, and plan preparation. FM No. 439051-5201. Contact: Mario Duran,
<br />mario.duran@dot.state.fl.us
<br />FDOT D6 | NW 107th Avenue from SR 836 to NW 58th St | 2024-Ongoing | RRR project to
<br />improve roadway conditions by milling and resurfacing existing pavement while enhancing
<br />traffic capacity and safety. Activities included repaving and restriping the roadway, updating
<br />curb ramps, upgrading lighting, signalization, signing and pavement markings, and crosswalk
<br />improvements. Responsible for roadway design, modeling, and pavement marking plan
<br />preparation. FM No. 452560-15201.Contact: Arecely Andollo, aracely.andollo-
<br />Soto@dot.state.fl.us
<br />FDOT D6 | SR 976/ SW 40th Street/ Bird Road from East of SR 826 to SW 58th Avenue |
<br />2022-2023 | Designer for an RRR project to preserve and extend the life of the roadway by
<br />milling and resurfacing existing pavement and widening median turn lanes. Activities included
<br />adding sidewalks, repaving and restriping the roadway, installing curb ramps, upgrading
<br />lighting, signalization, signing and pavement markings, and crosswalks. Responsible for
<br />roadway design, modeling, and plan preparation. FM 445991-1-32-01 Contact: Elsa Riverol,
<br />305-470-5105; Elsa.Riverol@dot.state.fl.us
<br />FDOT D4 | Homewood Blvd from Old Germantown Rd to Lowson Blvd, | 2018-2020 |
<br />Mobility project in Delray Beach. Included roadway widening and/or lane repurposing to
<br />accommodate designated bike lanes and sidewalks on both sides of the road, construction of
<br />a cast-in-place retaining wall at LWDD L-36 Canal crossing, and signal replacement at Linton
<br />Blvd intersection. Contract No. CA220, FM 438394-1-32-01 Contact: Angelene Frederick,
<br />FDOT D4, angelene.frederick@dot.state.fl.us, 954-777-4650
<br />FDOT D6 | SW 336th St/Davis Pkwy from SR 997/Krome Ave to US-1 (Truck Bypass)|
<br />2016-2023 | Reconstruction of Davis Pkwy to extend the capacity of existing pavement to
<br />facilitate truck bypass, add right turn lanes at intersections of Davis Pkwy/Krome Ave and Davis
<br />Pkwy/US-1, improving drainage throughout project limits. Reconstruction activities included
<br />adding sidewalks, repaving and restriping roadway, installing curb ramps, upgrading lighting,
<br />signalization, signing and pavement markings, and crosswalks. Responsible for providing
<br />roadway, drainage system, temporary traffic control design services, signing & pavement
<br />marking improvements, and signalization and lighting design. Contract No. C9O63, FM No.
<br />405575-7-32-01; Contact: Nathan Pulido, 305-470-5207; Nathan.Pulido@dot.state.fl.us
<br />SR-A1A RRR and Turning Lanes Extension | 2019-2020 | Milling and resurfacing project
<br />with right-turn lane extensions at three intersections at SR-A1A from 17th St to Beach land
<br />Blvd, in charge of signing & pavement markings per FDOT and MUTCD standards. Contact:
<br />Eithel M. Sierra, PE, A&P Consulting, 305-592-7283, emsierra@apcte.com
<br />EDUCATION
<br />BS Civil Engineering
<br />Florida International
<br />University, 2017
<br />YEARS OF EXPERIENCE
<br />Total 8 years
<br />2020 - Present – CALTRAN
<br />REGISTRATIONS
<br />ƒEngineer Intern – Florida
<br />PROFICIENCIES
<br />ƒAutoCAD Civil 3D
<br />ƒOpenRoads Designer
<br />ƒGEOPAK
<br />ƒMicroStation (2D and 3D)
<br />ƒProjectwise
|