My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALTRAN Engineering Group, Inc Bid Document
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CALTRAN Engineering Group, Inc
>
CALTRAN Engineering Group, Inc Bid Document
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:37:39 PM
Creation date
8/31/2026 12:36:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARLOS BORGES <br />DESIGNER <br />median openings. Responsible for the Traffic monitoring Site, Signalization, and Lighting Plans, and involved with roadway <br />plans production. Also, responsible for shop drawing review and post design services. <br />FDOT D4 | US-441/ SR 7 from North of Glades Road to North of Bridgebrook Drive | July Jimenez, PE, FDOT District <br />IV, (954) 777-4415, July.Jimenez@dot.state.fl.us | 2022 to 2024 |Milling and resurfacing project with 3.42 miles, that <br />included adding sidewalk and shoulder regrading, curb ramps upgrades at signalized intersections (5), replacing guardrails at <br />some locations. Responsible for the Traffic Monitoring Sites, Signalization and Lighting plans. Also, responsible for shop <br />drawing review and post design services. <br />FDOT D4 | SR 5 (N. Federal Hwy) from South of 10th Ave. South to 6th Ave North | Jagannatha R Katkuri, PE, <br />Constructive Engineering, Inc., (203) 809-0368, jagan@constructive-eng.com | 2021 to 2023 | Milling and resurfacing <br />project with 1.222 miles, which included sidewalk replacement, drainage improvements, curb ramps upgrades at several <br />intersections. Responsible for the Traffic Monitoring Sites, Signalization and Lighting plans. Also, responsible for shop drawing <br />review and post design services. <br />FDOT D6 | SR 90/SW 7 Street from West of SW 2 Avenue to Brickell Avenue | FDOT D6 | Mario Duran Camejo, P.E., <br />(305) 470-5183, Mario.Duran@dot.state.fl.us | 2023 to ongoing |Milling and resurfacing project with 0.452 miles. The <br />improvements associated with this project include milling and resurfacing. ADA curb ramps, signing and pavement markings, <br />signalization, and lighting plans. Responsible for the Lighting Plans, and involved with roadway plans productions. <br />FDOT D6 | SR 985/NW 107 Avenue from North of Flagler Street to North of SR 838 (Dolphin Xwy) | FDOT D6 | Claudia <br />Gutierrez, P.E., (305) 470-5268, Claudia.Gutierrez@dot.state.fl.us | 2025 to ongoing |Milling and resurfacing project with <br />0.777 miles. The improvements associated with this project include milling and resurfacing. Guardrail end anchorage <br />installation, signing and pavement markings, and signalization. Involved in roadway and signing and pavement marking plans <br />productions, and quality control.
The URL can be used to link to this page
Your browser does not support the video tag.