Laserfiche WebLink
MICHAEL HERNANDEZ <br />PROJECT TEAM LEADER <br />PROFILE <br />Mr. Hernandez brings over 18 years of experience to a variety of design projects, including <br />intersection improvements, school zone designs, signalization, signing, pavement markings, <br />and traffic control designs. His technical expertise spans industry-standard software such as <br />MicroStation V8i, Power Geopack, OpenRoads Design, and AutoCAD. He is skilled in creating <br />detailed maps using GIS files for data collection and is well-versed in web design and <br />Photoshop renderings, often used in FDOT proposal presentations and project deliverables. <br />Mr. Hernandez has extensive experience conducting a wide range of traffic studies, including <br />traffic counts, vehicle classification, turning movement studies, speed studies, travel time and <br />delay studies, parking studies, vehicle gap studies, and roadway characteristics inventories. <br />He is proficient in collecting measurements for roadway features based on the latest FDOT <br />RCI manual, such as lane widths, medians, sidewalks, and shoulders. Additionally, he has <br />experience with data input into the FDOT mainframe system. <br />KEY PROJECTS <br />FDOT D6 | Transportation Systems Planning & Statistics Support (2021-Present) | <br />Assisting in multiple assignments includingProject Traffic/Travel Demand Forecasting, Mobility <br />Performance Measures, Feasibility and Special Studies, Transportation Plan Development, & <br />Data Collection. Contract No.: CAL78, FM No. 252180-2-12-03, Contact: Ana M. Calleja, FDOT <br />D6, 305-470-5283, AnaM.Calleja@dot.state.fl.us <br />FDOT D4 |Transportation Statistics Data Collection and Analysis (2021-Present) |Served <br />as a prime consultant; assisting project manager with assignments such as coordination and <br />review of roadway characteristics and traffic data collection provided engineering in-house <br />support for FDOT as the RCI coordinator. FDOT D4, Contact: Victori Peters, 954-777-4108, <br />Victoria.Peters@dot.state.fl.us <br />FDOT D6 | Transportation Statistics #1 (2020-Present) |Assist the Project Manager with <br />supervising the traffic and roadway data collection and analysis for the Statistics Unit in the <br />Planning Office. The project’s assignments include 24, 48, & 72 hr. traffic counts, researching <br />and recording data into the Roadway Characteristics Inventory (RCI) and Highway <br />Performance Monitoring System (HPMS) databases, Straight Line Diagrams (SLD), traffic <br />counts, jurisdictional transfers, and GIS services. Provided in-house engineering support <br />services for FDOT as the Traffic Coordinator. FDOT, Miami, Florida. Contact: Ana M. Calleja, <br />FDOT D6, 305-470-5283, AnaM.Calleja@dot.state.fl.us <br />FDOT D6 | D/W Traffic Operations RCI Data Collection (2021–Present) | Deputy Project <br />Manager. Assist the project manager with multiple tasks assignments such as traffic operation <br />roadway characteristics inventories, evaluation of speed limits, evaluation of general public <br />complaints, school zone reviews, and bottleneck studies. Contract No. CAE92. FM 249726-8- <br />32-01; Contact: Ramon Sierra, 305- 470-5336, Ramon.Sierra@dot.state.fl.us <br />FDOT D6 | General Engineering Consultant Support Services (2016-Present) | Multiple <br />tasks performed included preparing traffic control plans for rail crossings, providing rail crossing <br />inspection, and plans reviews including the design review process for the signing and pavement <br />and signalization components of all crossings being part of the Brightline-All Aboard Florida <br />within Miami Dade County. This review included incorporating comments into the ERC, actively <br />participating in the design review meetings, and coordinating with FDOT. Additional tasks <br />include administrative support as part of 5310 & 5311 federal programs, grant audit for airport <br />improvements, district-wide truck turn radii methodology development, transit triennial <br />inspections, and on-site support. Contract No. C9R18, FM 438076-1-22-02; Contact: Carlos <br />Cejas, Gannett Fleming, 786-845-9540 <br />EDUCATION <br />AS Computer Drafting & <br />Design <br />ITT Technical Institute, 2010 <br />YEARS OF EXPERIENCE <br />Total 18 years <br />2011 - Present – CALTRAN <br />PROFICIENCIES <br />ƒHighway and Traffic Data <br />Collection <br />ƒMicroStation V8i <br />ƒGEOPAK <br />ƒOpenRoads <br />ƒAutoCAD Civil 3D <br />ƒAutoTurn <br />ƒGuideSIGN <br />*GIS Pro <br />ƒFEC Roadway Worker <br />Protection <br />ƒHPMS BT-04-0005, FDOT, <br />2008 <br />ƒPlanning Roadway Data <br />Collection, BT-04-0039, BT- <br />04-0040, BT-04-0041, FDOT, <br />ƒ2008 OSHA certification <br />ƒGuardrail Installation & <br />Inspection TRESS course <br />2010 <br />ƒIntermediate/Advanced MOT