Laserfiche WebLink
MICHAEL HERNANDEZ <br />PROJECT TEAM LEADER <br />Signal Improvements for NW 57th Avenue and SW 45th Street (2024) | Provided design service to complete signalization <br />improvements as part of a new development at SW 45th Street. Implementation consisted in signal and pedestrian features, <br />controller phasing, and pay item quantities among others. Scott Hodges, shodges@wsvn.com <br />School Zones Speed Cameras various locations (2024-present) | Provided design services for more than 100 school zones <br />throughout Florida to complete signalization plans and permitting for the implementation of speed cameras within school zones. <br />RedSpeed Florida, Julio Silva, 331-201-0194, julio.silva@redspeed.com <br />Zelda Glacier Signal Improvements at SW 26 <br />th Street and SW 149 <br />th Avenue (2024) | Provided design service to complete <br />signalization improvements as part of the Zelda Glacier Park construction. Implementation consisted in signal and pedestrian <br />features, controller phasing, and pay item quantities among others. Charles Serig, 305-222-1421, cserig@hntb.com <br />Signal Improvements for NW 1st Avenue re-alignment (2020) | Provided design service to complete signalization <br />improvements as part of NW 1st Street re-alignment at two locations including pedestrian features improvements at a mid-block <br />crossing. DT Miami A, LLC, Mauricio Anderson, 305-520-2300, Mauricio.anderson@feci.com.com <br />Signal Improvements at Flagler and NW 1st Avenue and NW 1st Street and NW 1st Avenue (2020)| Provided design service <br />for the signalization modification at two signalized intersections as part of the Courthouse improvements. Modification consisted <br />in signal and pedestrian features, controller phasing, and pay item quantities among others. Kimley Horn, Inc., Alberto Herrera, <br />305-535-7742, alberto.herrera@kimley-horn.com <br />The City of Miramar | Roadway and Signalizations Improvements for Miramar Pkwy with Ivy Way, Dykes Rd and SW <br />245th Avenue (2020-2021) | Improvements to three intersections in Miramar, including preparation of roadway, signing and <br />pavement markings, signalization and drainage components as well as a traffic evaluation for a mid-block crossing. City of <br />Miramar, Alex Shershevsky, 954-602-3315, ashershevsky@miramarfl.gov <br />City of Miami Gardens | Continuing Architectural and Engineering Services (2014-present) | Provided traffic and roadway <br />design engineering services for projects authorized by City. Included plats review and survey acceptance for 15+ plats, traffic <br />impact peer review process for Walmart, Family Dollar Store, and Top Golf driving range and traffic calming design in multiple <br />locations. Advising role as part of noise evaluation study to implement F1 race track at Hard Rock Stadium, evaluation of plats <br />and site plans, serve as peer reviewer for traffic impact and parking variances applications.Contract No. ITB No. 18-19-008, <br />Contact: Tom Ruiz, Public Works Director, 786-279-1260, truiz@miamigardens.fl.gov <br />FDOT D6 | SW 336th St/Davis Pkwy from SR-997/Krome Ave to US-1 (Truck Bypass) (2016-2020) | Reconstruction of <br />Davis Pkwy to extend the capacity of existing pavement to facilitate truck bypass, add right turn lanes at intersections of Davis <br />Pkwy/Krome Ave and Davis Pkwy/US-1, improving drainage throughout project limits. Reconstruction activities included <br />adding sidewalks, repaving and restriping roadway, installing curb ramps, upgrading lighting, signalization, signing and <br />pavement markings and crosswalks. Responsible for providing roadway, drainage system and temporary traffic control design <br />services, signing & pavement marking improvements, and signalization and lighting design. Contract No. C9O63, FM No. <br />405575-7-32-01; Contact: Nathan Pulido, FDOT D6, 305-470-5207; Nathan.Pulido@dot.state.fl.us <br />Sun Life/HARD ROCK Stadium MOT Plans (2010-present) | Since 2010, responsible for designing engineering services for <br />MOT plans per FDOT Standards for major detour along Florida's Turnpike connections from Golden Glades and HEFT during <br />pre- and post-special-event traffic. Includes key sheets, lane closure analysis, project layout, tabulation of quantities using <br />FDOT pay items, notes, special signing sheets, and detour route plans for all Dolphin games and special events at stadium. <br />Contact: Alan Riano, Miami Dolphins Corporate Headquarters, 305-943-6501, ARiano@dolphins.com <br />FDOT D4 | DW Minor Design Consultant, Commodore Drive Sidewalk Improvements, Broward County, FL (2015-2018) <br />| Minor design consultant, responsible for providing design services for project corridor and proposed roadway typical section <br />along the length of project; consisted of existing 4-10-ft wide travel lanes, existing 7-ft unpaved outside shoulders, existing 5-ft <br />wide sidewalk on southbound, proposed 5-ft wide sidewalk on northbound. The purposewas to remove the existing 4-ft sidewalk <br />and construct 5-ft. Contract No. C9G03, FM No. 42362973201;Contact: Edwin F. Mojena, PE, HW Lochner, (305) 503-9873, <br />emojena@hwlochner.com