Laserfiche WebLink
DANIEL CHACON <br />ENGINEER TECHNICIAN <br />PROFILE <br />Mr. Chacon has been involved in various planning, studies, and data collection projects. He is <br />experienced in conducting a range of traffic studies, including traffic counts, vehicle and <br />pedestrian classifications, turning movement studies, parking studies, roadway characteristics <br />inventory, signal warrants, and speed studies. <br />KEY PROJECTS <br />Access Management Study – SR 916/NW 135 Street (2023) | conducted an access <br />management study along SR 916/NW 135 Street between NW 47 Avenue and NW 30 Avenue <br />under an FDOT Traffic Operation Studies contract. This evaluation followed the 2023 FDOT <br />Multimodal Access Management Guidebook and the Corridor Access Management Plan <br />(CAMP) process, which includes assessing existing and future conditions, developing a vision, <br />and identifying necessary improvements. My analysis focused on optimizing access points, <br />improving traffic flow, and enhancing safety for all users. Public participation played a key role <br />in shaping the recommendations, ensuring alignment with community needs and FDOT <br />guidelines. FDOT D6, Xaviel Llerena, (305) 470-5303 <br />Accessible Pedestrian Signal (APS) Feasibility Study – SR 953/Le Jeune Road (2023) <br />| I conducted a feasibility study to evaluate the implementation of Accessible Pedestrian Signals <br />(APS) at key intersections along SR 953/Le Jeune Road, including Minorca Avenue, Andalusia <br />Avenue, Valencia Avenue, and Bird Road in Coral Gables. This assessment followed MUTCD <br />Chapter 4C standards, FDOT’s Traffic Engineering Manual (TEM), and Miami-Dade County’s <br />Signals and Signs Guidance. I analyzed intersection characteristics, collected traffic and <br />pedestrian data, and evaluated existing signal attributes to determine the necessity and <br />feasibility of APS installations. FDOT D6, Xaviel Llerena, (305) 470-5303 <br />Technical Memorandum –SR 860/NE 185 Street (Royal Bahamian Condominiums) (2023) <br />| I conducted a technical analysis to evaluate traffic flow issues along SR 860/NE 185 Street <br />between NE 12 Avenue and NE 14 Avenue near the Royal Bahamian Condominiums. This <br />study was performed under an FDOT Traffic Operation Studies contract in response to <br />concerns about vehicles parking along the outside lawn shoulder. My analysis focused on <br />optimizing traffic movement while ensuring safety for all road users. FDOT D6, Xaviel Llerena, <br />(305) 470-5303 <br />Central Island Improvements – City of Sunny Isles (2024)| I conducted a comprehensive <br />traffic circulation assessment in three phases, incorporating short- and long-term <br />recommendations based on the City’s request. My focus was on improving the planning, design, <br />operation, and maintenance of streets to ensure safe and efficient mobility for all users, <br />including pedestrians, bicyclists, motorists, and transit riders. I analyzed traffic patterns, <br />identified key areas for improvement, and proposed infrastructure enhancements to optimize <br />transportation flow and safety. Richard Labinski, (305) 470-5303 <br />Qualitative Assessment – SR 860/Miami Gardens & NE 18 Avenue (2024)| I conducted a <br />qualitative assessment, including a lighting analysis, at the intersection of SR 860/Miami <br />Gardens Drive/NE 185 Street and NE 18 Avenue. The goal was to evaluate the need for <br />improvements by analyzing traffic conditions, lighting adequacy, and safety concerns. Based <br />on my findings, I provided recommendations aimed at enhancing visibility, optimizing traffic <br />flow, and improving overall intersection functionality for all road users. FDOT D6, Xaviel <br />Llerena, (305) 470-5303 <br />EDUCATION <br />BS Mechanical Engineering <br />Florida International <br />University, 2022 <br />YEARS OF EXPERIENCE <br />Total 2 years <br />2023 - Present - CALTRAN <br />PROFICIENCIES <br />ƒAutoCAD <br />ƒVistro <br />ƒSyncro <br />