|
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH | CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)21
<br />CES CONSULTANTS, INC.
<br />RFQ Scope Requirement CES Team Capability/Response Lead/Supporting Staff & Resources Supporting Experience/Page
<br />Contract administration
<br />and construction
<br />inspection
<br />MEETS/EXCEEDS. CES provides
<br />CEI, construction management,
<br />contract administration and owner
<br />representative services for municipal,
<br />county, state and other public-sector
<br />clients. Services extend from Notice to
<br />Proceed through final completion and
<br />closeout and include field inspection,
<br />documentation, contractor coordination,
<br />payment support, change management
<br />and compliance monitoring.
<br />Juan Rodriguez Ortiz; James “Jim”
<br />Wille, CGC; Jorge Zurita, CGC; CEI
<br />Inspection Team
<br />CEI Qualifications, pages
<br />69–94; CEI Organizational
<br />Chart, page 99; CEI Approach,
<br />pages 207–225
<br />Materials sampling and
<br />testing
<br />MEETS/EXCEEDS. CES coordinates
<br />inspection and materials quality
<br />requirements with dedicated testing
<br />resources. Terracon is included on the
<br />team specifically for materials sampling
<br />and testing.
<br />Terracon; Javier E. Jiménez, PE; CES
<br />CEI Team
<br />CEI Organizational Chart, page
<br />99; Terracon, page 185; CEI
<br />Approach, pages 207–225
<br />Florida-registered PE
<br />with CEI training and
<br />experience
<br />MEETS. The CES Team includes Florida-
<br />licensed professional engineers with
<br />construction inspection experience,
<br />including Morgan Villanueva, PE, SI,
<br />FRSE, supported by an experienced team
<br />of CEI professionals and inspectors.
<br />Morgan Villanueva, PE, SI, FRSE;
<br />CEI Team
<br />CEI Organizational Chart, page
<br />99; Morgan Villanueva, PE, SI,
<br />FRSE, page 166; CEI Resumes,
<br />pages 163–185
<br />Construction cost
<br />estimates
<br />MEETS/EXCEEDS. CES provides cost
<br />estimating, independent cost review,
<br />cost control, change order evaluation,
<br />value engineering and constructability
<br />analysis through dedicated estimating
<br />and project controls resources.
<br />Manuel A. De La Cruz; Juan
<br />Rodriguez Ortiz
<br />CES Professional Services,
<br />page 9; CEI Organizational
<br />Chart, page 99; Cost Control,
<br />page 189; Manuel A. De La
<br />Cruz, page 181; CEI Approach,
<br />pages 207–225
<br />Inspection of structural,
<br />building, plumbing,
<br />mechanical, electrical
<br />and roofing construction
<br />in accordance with
<br />applicable codes and
<br />State law
<br />MEETS. CES’s CEI approach specifically
<br />provides for multidisciplinary inspection
<br />and code/contract compliance. The team
<br />combines experienced construction
<br />inspectors and construction managers with
<br />specialized engineering resources available
<br />for structural, building, mechanical,
<br />plumbing and electrical disciplines as
<br />required by individual assignments.
<br />CEI Inspection Team; James “Jim”
<br />Wille, CGC; Jorge Zurita, CGC
<br />CEI Qualifications, pages
<br />69–94; CEI Resumes, pages
<br />163–185; CEI Approach, pages
<br />207–225
<br />Preconstruction, plan
<br />review, constructability,
<br />bidding and construction
<br />administration
<br />MEETS/EXCEEDS. CES provides
<br />integrated preconstruction and
<br />construction phase services,
<br />including plan/specification review,
<br />constructability and value engineering,
<br />bid support, contractor coordination,
<br />schedule and cost review, field
<br />oversight, change management, punch
<br />list, closeout and record documentation.
<br />Juan Rodriguez Ortiz; James “Jim”
<br />Wille, CGC; Jorge Zurita, CGC
<br />CEI Qualifications, pages
<br />69–94; James “Jim” Wille,
<br />CGC, page 164; Juan Rodriguez
<br />Ortiz, page 165; Jorge Zurita,
<br />CGC, page 179; CEI Approach,
<br />pages 207–225
|