My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc. Bid Document (23)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CES Consultants, Inc
>
CES Consultants, Inc. Bid Document (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:40:45 PM
Creation date
8/31/2026 12:37:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 33 <br />CES CONSULTANTS, INC. <br />WEST AVENUE IMPROVEMENTS <br />PHASE III SOUTH <br />LOCATION <br />Miami Beach, FL <br />OWNER <br />City of Miami Beach <br />COST <br />$60M <br />COMPLETION <br />2025–Ongoing <br />ROLE <br />Prime <br />KEY FEATURES <br />Design-Bid-Build <br />Water Transmission/ <br />Distribution System <br />Sanitary Sewer Collection System <br />Urban Pump Stations, Stormwater <br />& Drainage <br />Utility Relocation <br />Roadway Restoration <br />Streetscapes/Complete Streets <br />Design <br />Property Harmonization with <br />Artist’s Renderings for Each <br />Property <br />SUE/Utility Coordination <br />MOT & Signalization <br />Sidewalk/Curbing <br />Interagency Coordination <br />Public Involvement <br />The City of Miami Beach (CMB) awarded CES a design contract for neighborhood and resiliency <br />improvements throughout the West Avenue South Corridor. Rising seas, high groundwater, king <br />tides, wind, and deteriorating infrastructure have contributed to frequent flooding of City facilities, <br />residences, and business properties within the West Avenue Basin. This project will provide the <br />community with increased protection from flooding during storm events and high seasonal tides, as <br />well as an improved level of service for existing infrastructure. <br />The scope includes verification and development of a stormwater model and the design, vertical <br />rehabilitation, harmonization, and ultimate construction of approximately one mile of roadway, <br />sidewalks, landscaping, and related infrastructure. Responsibilities include delivery of a pedestrian- <br />friendly “Complete Streets” redesign and incorporation of findings from the 100 Resilient Cities <br />Workshop. Improvements include raising the existing roadway grade by approximately 30 inches <br />MIAMI BEACH, FLORIDA, 33139MAP LOCATION: <br />8th ST <br />9th ST <br />10th ST <br />11th ST <br />12th ST <br />13th ST <br />14th ST <br />WEST AVEPROJECT AREAALTON CT
The URL can be used to link to this page
Your browser does not support the video tag.