RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH | CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)34 <br />CES CONSULTANTS, INC. <br />while providing drainage capacity for a 10-year storm event level <br />of service with no structure flooding, a revised typical section <br />incorporating pedestrian and bicyclist-friendly corridors, public/ <br />private property harmonization, new traffic signals, street <br />lighting, and landscaping. The project also includes design <br />and harmonization of the primary commercial and high-rise <br />condominium areas, requiring enhanced pedestrian access, <br />landscaping, and a modified roadway cross-section between 8th <br />and 14th Streets to support bicycle traffic. <br />Coordination & Outreach: Efforts include collaboration with <br />CMB and the public through the Public Information Officer (PIO), <br />as well as management and coordination of 10 subconsultants <br />across multiple disciplines. Bi-weekly design, utility, and project <br />meetings were directed or attended with City staff and project <br />team members. Multiple public meetings were developed and <br />supported, including preparation of presentations for City review <br />and community engagement. Participation in the 100 Resilient <br />Cities Workshop resulted in direct design enhancements. An <br />arborist was utilized to identify and evaluate the existing tree <br />canopy within and adjacent to the right-of-way to preserve <br />existing green infrastructure where feasible. <br />Encroachment reviews and optional design considerations were <br />conducted to resolve conflicts, resulting in harmonization plans <br />for 55 properties. Each property plan set included a site plan, <br />landscape plan, and 3D perspective rendering. In addition, four <br />existing City and FDOT stormwater pump stations that interface <br />with the project were evaluated for emergency generator <br />locations and connections, supported by supplemental surveys <br />and site investigations to enhance system resiliency. <br />Utility coordination included collaboration with 18 utility <br />providers along the project right-of-way to identify existing <br />facilities, conflicts, and opportunities for relocations or <br />adjustments. A Master Utility Plan was created, developed, and <br />maintained to integrate and remediate affected utilities. Using <br />Civil 3D software, a detailed 3D utility model and interactive <br />video were developed to represent existing and proposed <br />subsurface conditions, minimize conflicts, and improve utility <br />corridor planning. <br />Transportation: Improvements include standardizing travel <br />lanes to 10 feet, introducing raised medians where feasible, <br />and reconfiguring intersections to incorporate split pedestrian <br />ramps to improve ADA accessibility and sightlines. Operational <br />traffic analyses were also performed to meet Department of <br />Transportation and Public Works (DTPW) requirements for lane <br />modifications and crosswalk additions. <br />Stormwater Drainage System: Improvements include review and <br />evaluation of two existing hydraulic models and development <br />of an updated Stormwater and Hydraulic Model for the West <br />Avenue Project Basin, encompassing approximately 600 acres <br />extending east to the Atlantic Ocean. Modeling was performed <br />using ICPR4 and included upsizing of drainage lines, curb <br />inlets, and yard piping, along with significant upsizing and <br />modifications to proposed pump stations. Pre- and post- <br />construction scenarios and three alternative stormwater models <br />were developed, accounting for proposed roadway elevations <br />and existing finished floor elevations. A hydraulic grade line was <br />developed and maintained at one foot below the lowest finished <br />floor elevation. <br />The project includes replacement and upsizing of the stormwater <br />drainage system including 2,055 LF of 24-inch RCP drainage, 30 <br />LF of 30-inch RCP drainage, 870 LF of 48-inch RCP drainage, and <br />1,700 LF of 60-inch RCP drainage, with equivalent box culvert <br />alternatives considered. <br />Water Distribution & Transmission System: Improvements <br />include replacement of existing water mains, including 980 <br />LF of 6-inch fire service lines, 3,900 LF of 12-inch distribution <br />main, and 2,400 LF of 20-inch transmission main. New service <br />connections, meters, hydrants, and irrigation lines will be <br />installed, and existing water mains will be decommissioned. This <br />new system will be installed along West Avenue, between 8th <br />and 14th Streets, and along 8th Street to 14th Street between <br />West Avenue and Alton Road. <br />Sanitary Sewer Collection System: Improvements include <br />rehabilitation and replacement-in-kind of the existing collection <br />system along with adjustments to slopes and manholes, with <br />replacement of 3,350 LF of pipe ranging from 12-inch to 18-inch <br />diameters and installation of 30 maintenance access structures. <br />Construction Phase: During this phase, CES will serve as <br />construction manager and inspector on behalf of the City, <br />reviewing non-compliance notices, verifying maintenance <br />of traffic implementation, coordinating utility shutdowns <br />and tie-ins, and leading substantial and final completion <br />processes, including punch lists, certification packages, as-built <br />documentation, O&M reviews, and final payment certification.