My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc. Bid Document (23)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CES Consultants, Inc
>
CES Consultants, Inc. Bid Document (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:40:45 PM
Creation date
8/31/2026 12:37:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 40 <br />CES CONSULTANTS, INC. <br />Task orders include the following: <br />Flagler Sewer Replacement: The City of Homestead tasked CES with the development of a design <br />and the permitting for the replacement of 3,400 LF of 8-inch sanitary sewer with a 24-inch sanitary <br />sewer main and a new approximately 3,400 LF 8-inch water main along Flagler Avenue from <br />Krome Avenue to Campbell Drive. The purpose of the replacement is due to bad condition and to <br />increase capacity of the line for future development. The scope of work includes topographic survey; <br />geotechnical report; development of engineering plans (60% and 90%); preparation of contract and <br />bid document (plans and specifications); permitting; procurement assistance; Opinion of Probable <br />Construction Cost (OPCC) and schedule development; and Engineering Services During Construction. <br />Water & Sewer Infrastructure Master Planning: CES provided comprehensive master planning <br />services for the City of Homestead’s water and wastewater infrastructure with an aim to evaluate <br />system capacity, identify the impacts of future developments, and streamline connection requests. <br />Scope of work included data collection and system analysis, vulnerability assessments to identify <br />critical infrastructure risks, and capital improvement planning (CIP) to prioritize system upgrades. <br />CES analyzed existing and future water distribution and wastewater collection systems, assessed <br />lift stations and pump stations, evaluated interconnections, and developed system performance <br />criteria. Deliverables included a prioritized CIP with phased recommendations, cost estimates, and <br />a comprehensive Water and Wastewater Master Plan Report, incorporating findings, models, and <br />strategic planning for long-term system improvements. CES coordinated closely with City staff, <br />provided technical training, and ensured seamless project execution to enhance Homestead’s <br />infrastructure resilience and operational efficiency. <br />LOCATION <br />Homestead, FL <br />OWNER <br />City of Homestead <br />COST <br />Fee Only <br />COMPLETION <br />Multiple; Contract: 2013–Ongoing <br />ROLE <br />Prime <br />KEY FEATURES <br />Water/Wastewater Master Plan <br />Strategic Planning <br />Cost Estimates <br />System Performance Criteria <br />Development <br />Technical Training <br />Capital Improvement Planning <br />CITY OF HOMESTEAD PROFESSIONAL A/E SERVICES
The URL can be used to link to this page
Your browser does not support the video tag.