My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc. Bid Document (23)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CES Consultants, Inc
>
CES Consultants, Inc. Bid Document (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:40:45 PM
Creation date
8/31/2026 12:37:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH | CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)41 <br />CES CONSULTANTS, INC. <br />RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br />Page 41 <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />REFERENCE QUESTIONNAIRE <br />It is the responsibility of the proposer to provide a minimum of three (3) different references other than City <br />of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so <br />may result in the rejection of your submission. <br />Giving reference for: (Firm) _______________________________________________________________ <br />Firm giving Reference: ____________________________________ _______________________________ <br />Phone: ____________________________________________ <br />Email: ___________________________________________ <br />1.Q: Rate the firm’s success in providing their services as it relates to the project. <br />A: <br />2.Q: Rate the competence and accessibility of the personnel directing, supervising and <br />performing the work on your project. <br />A: <br />3.Q: Would you use them again? <br />A: <br />4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel <br />necessary to successfully complete your project? <br />A: <br />5.Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates <br />and content? <br />A: <br />6.Q: Is there anything else we should know, that we have not asked? <br />A: <br />The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and <br />are made independently, free from vendor interference/collusion. <br />Name: _______________________________________ Title _____________________________________________ <br />Sign Name: __________________________________ Date: __7/22/2026_________________________________ <br />CES Consultants, Inc. <br />City of Homestead <br />Mina Samadi, PE Assistant Director, Public Works Department <br />305.224.4773 <br />msamadi@homesteadfl.gov <br />(City of Homestead Professional A/E Services) <br />CES designed the water and sewer system along Flagler Ave in City of Homestead.The project is in construction <br />and the City was very satisfied with the design performance. <br />Design staff was competent and accessible,and directing supervisors were engaged on the project. <br />yes. <br />Rated highly,yes. <br />Rated highly,yes. <br />No
The URL can be used to link to this page
Your browser does not support the video tag.