My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc. Bid Document (23)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CES Consultants, Inc
>
CES Consultants, Inc. Bid Document (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:40:45 PM
Creation date
8/31/2026 12:37:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 51 <br />CES CONSULTANTS, INC. <br />The purpose of the project was to provide drainage and traffic improvements through roadway <br />widening, median installations, redesign of intersections, and improvements to drainage, parking, <br />lighting, signalization and landscaping in the Coconut Grove neighborhood of the City of Miami. The <br />land use is a combination of residential and commercial. Since the roadway is part of an older, well <br />established neighborhood, many different utilities are installed within the right of way. The project <br />corridor includes a 30-inch water main, smaller water mains, gas, multiple fiber-optic cable duct <br />banks, sanitary sewers and force mains, requiring extensive utility and interagency coordination. <br />Other complicating factors in the design were the elevations, which included low grades and a <br />high groundwater table at the southern end of the project directly adjacent to Biscayne Bay, higher <br />elevations in the mid-section, and “normal” elevations around the northern end. <br />The final cross-section of the roadway included additional vehicular travel lanes, sidewalk, curbing, <br />drainage, on-street parking, a bicycle lane, and a traffic calming circle. The design required a clean <br />transition through planned driveway and property harmonization between the new roadway and <br />the existing private property ingress and egress to match the new roadway elevation, width and <br />contours. Additionally, the project required intensive utility coordination to execute the necessary <br />utility relocations, including coordinating with FPL to remove the existing power poles and install all <br />their assets below ground. <br />The stormwater drainage design was developed in accordance with the guidelines set forth by the <br />County and the Florida Department of Transportation. The design consists of approximately 70 <br />drainage structures to capture and convey all the stormwater, 3,000 LF of piping and 2,000 LF of <br />French drains divided into eight (8) independent, closed systems. By creating independent systems, <br />CES was able to develop a design that satisfied the project requirements while achieving significant <br />cost savings to the client compared to their customary approach of creating interdependent systems. <br />SW 27TH AVENUE DRAINAGE IMPROVEMENTS, <br />ROADWAY RECONSTRUCTION & WIDENING <br />LOCATION <br />Miami, FL <br />OWNER <br />Miami-Dade County <br />Public Works Department <br />COST <br />$5.7M <br />KEY FEATURES <br />Drainage Design <br />Hydraulic Analysis <br />Permitting <br />Interagency Coordination <br />Traffic Calming <br />Bike Lanes <br />Driveway Harmonization <br />Utility Coordination <br />Roadway Reconstruction <br />Value Engineering <br />Engineering Analysis <br />Roadways <br />Water and Sewer
The URL can be used to link to this page
Your browser does not support the video tag.