Laserfiche WebLink
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH | CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)50 <br />CES CONSULTANTS, INC. <br /> »Attendance at Construction Meetings to discuss and <br />resolve with the CMS, Construction Contractor and District <br />personnel items that were of concern to the team in <br />completing the project. <br /> »Reviewing and assisting the District in responding to shop <br />drawings submittals, Requests for Information (RFIs), <br />Requests for Clarification (RFCs), Requests for Proposals <br />(RFPs), Change Orders (COs), Field Orders (FOs), Value <br />Engineering (VE) Proposals, and Submittals. <br /> »Review of Testing Results, Quality Control and Quality <br />Assurance manuals and programs, Surveys, As-built <br />drawings, close-out documentation, and other documents <br />prepared by the contractor, the CMS firm and the Quality <br />Assurance firm that would enable CES to sign and seal the <br />Record Drawings and Completion Certification at the end <br />of construction. <br /> »Providing fully incorporated Record Drawings (in AutoCAD) <br />based on contractor certified as-built information (i.e. <br />red-line drawings) and provide Completion Certification at <br />the end of construction that are signed and sealed by the <br />Florida licensed Professional Engineer. The Record Drawing <br />is described as follows: 1) the “record/as-built” drawing is <br />a compiled representation of the constructed Project; 2) a <br />listing of the sources and the basis of information used in <br />the preparation of the “record/as-built” drawing; and 3) <br />that the drawing is believed to be correct to the best of the <br />engineer’s knowledge.