My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc. Bid Document (23)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CES Consultants, Inc
>
CES Consultants, Inc. Bid Document (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:40:45 PM
Creation date
8/31/2026 12:37:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 68 <br />CES CONSULTANTS, INC. <br />LOCATION <br />Miami-Dade County, FL <br />OWNER <br />Private Developer <br />COST <br />Not Available <br />KEY FEATURES <br />Traffic Circulation <br />Trip Distribution <br />and Traffic Assignment <br />Impact Determination <br />of Existing Roadway Network <br />Queuing Analysis <br />Parking Analysis Summary <br />Trip Generation <br />Auto Turn Analysis <br />Municipal Coordination <br />Individual Experience of <br />Darlene M. Fernandez, PE <br />TRAFFIC IMPACT STUDIES <br />Darlene’s experience includes the following: <br />Aventura Chabad Traffic Impact Study, Aventura, FL: Project Manager/Senior Engineer. Completed <br />the traffic impact statement for a new development located at the northeast corner of Biscayne <br />Boulevard and NE 210th Street. The existing land use was previously developed with an 11,255 SF <br />synagogue. The proposed development will include 113,870 SF of office space, a 44,493 SF synagogue <br />building, a 2,701 SF walk-in bank, and a 4,362 SF preschool. For the purpose of this study, the <br />analysis included traffic circulation, trip distribution and traffic assignment, impact determination of <br />existing roadway network, queuing analysis (preschool), and parking analysis summary. <br />6372 Collins Avenue Traffic Impact Study, Miami Beach, FL: Project Manager/Senior Engineer. <br />Conducted a traffic impact study for a proposed development with 19 residential units for the developer. <br />The existing land use consisted of four residential units. The analysis included a determination of <br />the impact based on trip generation, a site visit, on-site and off-site traffic circulation, including <br />signage and striping, evaluation of the sight distance triangle at the driveway, and evaluated the <br />trip distribution and traffic assignment based on the proposed circulation. An auto turn analysis was <br />also analyzed for the accommodation of a loading zone within the property. Different alternatives <br />were evaluated including changes to the site circulation to determine whether a loading zone <br />can be accommodated. Responsible for all aspects of this study including implementation and <br />preparation of technical memorandum, attendance at presentations and Planning Board meetings, <br />and coordination with client and the City of Miami Beach.
The URL can be used to link to this page
Your browser does not support the video tag.