Laserfiche WebLink
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 75 <br />CES CONSULTANTS, INC. <br />CITY OF MIAMI BEACH CONSTRUCTION ENGINEERING <br />INSPECTION (CEI) SERVICES ON AN AS-NEEDED BASIS <br />LOCATION <br />Miami Beach, FL <br />OWNER <br />City of Miami Beach <br />COST <br />Fee Only <br />COMPLETION <br />Multiple; Contract: 2023–Ongoing <br />ROLE <br />Prime <br />KEY FEATURES <br />Construction Engineering <br />Inspection Services <br />Construction Contract <br />Administration <br />Roadway Reconstruction <br />Seawall Installation <br />Roadway Widening <br />Milling and Resurfacing <br />Drainage Improvements <br />Signalization <br />Pavement Markings <br />Subaqueous Crossing <br />Water Main Aerial Crossing along West 41st Street <br />Bridge between Pine Tree Drive and Indian Creek Drive <br />Replacement: <br />• Contractor: QUALITY ENTERPRISES USA, INC. <br />• Total Contract Amount: $2,272,554.90 <br />• Contract Calendar Days: Substantial Completion: <br />210 calendar days and Final Completion: 30 <br />calendar days. Total: 240 calendar days. <br />Seawall Replacements at Flamingo Drive/29th Street Pedestrian Bridge & 48th Street/North Bay <br />Road Street End: The City of Miami Beach, encircled by 55 miles of seawall, faces a critical challenge <br />in enhancing its resilience against rising sea levels and tidal flooding. Of this extensive seawall <br />network, only five miles are publicly owned, underscoring the need for focused efforts on upgrading <br />and replacing these vital structures. Raising and fortifying seawalls are crucial steps toward <br />safeguarding the city’s waterfront and maintaining its structural integrity. This project includes <br />inspection of the new seawall installation, roadway widening, roadway reconstruction, milling and <br />resurfacing, drainage improvements, signalization, and pavement markings. <br />CES’s Construction Project Manager and Construction Engineering Inspectors are monitoring all <br />aspects of the projects and supervising the field inspection and materials testing team. The services <br />provided include guidance and resolution on field changes, MOT, PIO, RFIs, shop drawing submittals, <br />material acceptance, documentation, and pay requests, as well as responsibility for observing and <br />monitoring the project schedule and budget. The new seawall installation projects consist of: <br /> »Flamingo Drive & 29th Street Pedestrian Bridge Seawall: The project scope includes the <br />replacement of the existing seawall sections on 29th Street, including the installation of 49 <br />LF of concrete/sheet piles seawall, 50 LF of concrete seawall cap, six concrete piles, three <br />concrete batter piles, one row of limerock riprap boulders, roadway widening, roadway <br />reconstruction, milling and resurfacing, drainage improvements, signalization, and pavement <br />markings. Specifically, this project, managed in collaboration with Shoreline, involves the <br />installation of King and Bater piles to support concrete panels, which will be further reinforced <br />with a concrete cap to ensure durability. <br /> »48th Street & North Bay Road Street End Seawall: The project scope includes the replacement <br />of the existing seawall sections on 48th Street, including the installation of 49 LF of concrete/ <br />sheet piles seawall, 60 LF of concrete seawall cap, eight concrete piles, seven concrete batter <br />piles, one row of limerock riprap boulders, roadway widening, roadway reconstruction, milling <br />and resurfacing, drainage improvements, signalization, and pavement markings.