My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc. Bid Document (23)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CES Consultants, Inc
>
CES Consultants, Inc. Bid Document (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:40:45 PM
Creation date
8/31/2026 12:37:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 87 <br />CES CONSULTANTS, INC. <br />LOCATION <br />Broward County, FL <br />OWNER <br />Florida Department of <br />Transportation (FDOT)/ <br />I-595 Express, LLC <br />COST <br />$1.8B <br />KEY FEATURES <br />Construction Engineering & <br />Inspections <br />Construction Management Services <br />Materials Testing <br />Roadways <br />Infrastructure <br />Transportation <br />Paving <br />Geotechnical <br />QA/QC <br />Concrete Cylinders for Compressive <br />Strength Testing <br />Water & Cement Ratio Verification <br />Quality Control Tests <br />In-Place Density Tests (Nuclear <br />Gauge) <br />Asphalt Paving Operations <br />Inspection <br />CEI SERVICES FOR <br />I-595 CORRIDOR ROADWAY IMPROVEMENTS <br />The project involved of the reconstruction and widening of the I-595 mainline and all associated <br />improvements to frontage roads and ramps from the I-75/Sawgrass Expressway interchange to the <br />I-595/I-95 interchange, for a total project length of approximately 10.5 miles. The project passes <br />through, or lies immediately adjacent to, six jurisdictions: City of Sunrise; Town of Davie; City of <br />Plantation; City of Fort Lauderdale; Town of Dania; and unincorporated areas of Broward County. <br />Additionally, CES assigned certified CTQP Inspectors to sample Portland Cement Concrete at the <br />site during placement of the site’s structural concrete. The inspector made concrete cylinders for <br />compressive strength testing and performing plastic properties tests that included water/cement <br />ratio and temperature. During the placement of Class I concrete, the CTQP certified inspector <br />checked the water/cement ratio of the mix delivered at the frequency specified by the FDOT Standard <br />Specifications for Road and Bridge Construction (FDOT Specification). <br />We also provided a CTQP Earthwork Level I certified inspector to perform in-place density tests <br />with a nuclear gauge (ASTM D-2922) on compacted soils, as well as to collect soil samples needed <br />for laboratory testing. Additionally, CES provided asphalt paving inspection services according <br />to FDOT Standards. Our field representative confirmed the temperature of the material and the <br />placement of all layers, also preparing all documentation related to these activities. Finally, the field <br />representative monitored field conditions and that the contractor operated in compliance with a safe <br />working environment. <br />A major component of the project was the construction of three at-grade reversible express toll <br />lanes known as the 595 Express, serving express traffic to/from the I-75/Sawgrass Expressway from/ <br />to east of SR 7, with a direct connection to the median of Florida’s Turnpike. These lanes are operated <br />as managed lanes with variable tolls to optimize traffic flow and reverse directions in peak travel <br />times (eastbound in the AM and westbound in the PM). The public-private partnership (P3) between <br />the Florida Department of Transportation (FDOT) and a private concessionaire, I-595 Express, LLC, <br />provided for the design, construction, financing, operation, and maintenance of the roadway for a <br />35-year term. FDOT provided management oversight of the contract and installed, tested, operates, <br />and maintains all tolling equipment for the express lanes. The utilization of TIFIA financing and <br />P3 structuring allows for project delivery 15 years sooner and with approximately $394 million in <br />financing cost savings compared to more conventional delivery mechanisms.
The URL can be used to link to this page
Your browser does not support the video tag.